Assessment of Power Retail Cost by Penetration scenarios of Decentralized Generation in Korean Power System

우리나라 전력계통에서 분산형전원의 구축 시나리오에 의한 전력소매비용평가

  • Published : 2009.03.01

Abstract

This paper describes retail cost through scenario in the ratio of CG(Centralized Generation) and DG(Decentralized Generation) that constructs new generation capacity in the future. it is not calculated for the supply, but for demand considering an advantage of DG. In the Korea Power System, retail cost that composed of construction, T&D, fuel, maintenance and environment shows macro-trend that power system planning through penetration for DG will be more significant.

Keywords

References

  1. 에너지관리공단 '전력수급기본계획에 집단에너지설비의 장기적 반영 및 효과분석에 관한 연구', 2005
  2. Allen J. Wood, 'Generation, Operation, and Control', John Wiley & Sone, Inc, 1996
  3. 김용하, 'Mixtrue of Cumulants Approximation 방법에 의한 확률론적인 발전시뮬레이션에 관한 연구', 고려대학교, 1991
  4. 에너지공학회, 'The WADE Economic Model에 의한 분산형전원 분석', 2006
  5. 지식경제부, '제 3차 전력수급기본계획', 2006
  6. 지식경제부, '제2차 신재생에너지 기술개발 및 이용보급 기본계획', 2003
  7. 장기 송변전 설비계획(2006년-2020년), 한국전력공사 송변전본부 계통계획실, 2007. 1
  8. 신재생에너지 발전차액지원제도 개선 및 RPS제도와 연계방안, 산업자원부, 2006.03.31
  9. Michael Brown, Thomas R.Casten, 'The WADE Economic Model : China', WADE Publications, 2004
  10. 에너지관리공단 '집단에너지사업관려자료집', 2006
  11. 환경부, '대기환경보전법', 2006
  12. 전력거래소, '발전설비현황의 자료', 2006
  13. 전력거래소, '발전소별 발전현황', 전력통계시스템, 2005
  14. 전력거래소, '제 3차 전력수급기본계획 수립을 위한 기초 입력자료 산정', 2006
  15. 전력거래소, '제 3차 전력수급기본계획 수립을 위한 발전원별 건설공사비 산정, 설비방식별 원가구성비교', 2006
  16. 지식경제부, '제2차 전력수급기본계획', 2004
  17. 지식경제부, '제1차 전력수급기본계획', 2002
  18. 한국전력공사, '한국전력통계', 2004