남강댐하류의 물리적 하천교란 평가

Assessment of Physical River Disturbances in the Namgang-dam Downstream

  • 김기홍 (진주산업대학교 토목공학과)
  • Kim, Ki-Heung (Department of Civil Engineering, Jinju National University)
  • 투고 : 2008.02.11
  • 심사 : 2008.06.12
  • 발행 : 2008.06.29

초록

To assessment the disturbances of the Namgang caused by dam construction, upstream area was selected for the reference reach and downstream area was selected for the comparison reach. And these reaches were surveyed and analyzed according to the assessment criteria of the river disturbances.The artificial factors of river disturbances were classified as river improvement works, dam construction and aggregate dredging. The indexes were physical factors as like epifaunal (bottom), embeddedness, velocity/depth regime, sediment deposition, channel flow status, channel alteration, frequency of riffles, bank stability, vegetative protection, riparian zone etc.The assessment results showed 46% of the assessment criteria which was serious status in dam downstream area and 89.5% of it which was excellent status in dam upstream.Finally, the results showed that physical river environment in downstream area was disturbed by the discharge control and the interception of sediment discharge by dam, consequently this disturbance give rise to impact of ecosystem in river.

키워드

과제정보

연구 과제 주관 기관 : 한국건설교통기술평가원