• Title/Summary/Keyword: Dam construction Aggregate dredging

Search Result 3, Processing Time 0.017 seconds

Assessment of Physical River Disturbances in the Namgang-dam Downstream (남강댐하류의 물리적 하천교란 평가)

  • Kim, Ki-Heung
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.3
    • /
    • pp.74-86
    • /
    • 2008
  • To assessment the disturbances of the Namgang caused by dam construction, upstream area was selected for the reference reach and downstream area was selected for the comparison reach. And these reaches were surveyed and analyzed according to the assessment criteria of the river disturbances.The artificial factors of river disturbances were classified as river improvement works, dam construction and aggregate dredging. The indexes were physical factors as like epifaunal (bottom), embeddedness, velocity/depth regime, sediment deposition, channel flow status, channel alteration, frequency of riffles, bank stability, vegetative protection, riparian zone etc.The assessment results showed 46% of the assessment criteria which was serious status in dam downstream area and 89.5% of it which was excellent status in dam upstream.Finally, the results showed that physical river environment in downstream area was disturbed by the discharge control and the interception of sediment discharge by dam, consequently this disturbance give rise to impact of ecosystem in river.

The Temporal Changes of Channel Section in Naeseongcheon River, Kyeongbuk Province (경북 내성천 하도 단면의 시계열적 변화)

  • Lee, Gwang-Ryul;Kim, Dae Sik
    • Journal of The Geomorphological Association of Korea
    • /
    • v.18 no.2
    • /
    • pp.53-63
    • /
    • 2011
  • The changes and causes of channel section in Naeseongcheon River, a tributary of Nakdong River, during the long(1984~2001) and short(2009~2011) periods are analyzed. There are the declines of channel height with a maximum of approximately 2m in the most areas of the lower reaches during the past 20 years. These are thought as the influences of active aggregate collections and river dredging. The size of sand bar within the channel at the NM1 decreases greatly during the past 2 years. This may results from the decrease of sediment supply due to the Yeongju Dam construction in the upper reaches. However, the NM2 and NL2 where the natural channel are preserved experience the slight increase of height during the past 2 years. Therefore, the anthropogenic channel interferences in Naeseongcheon River have greatly influenced on the declines of channel height by the decrease of sediment supply.

Prediction of River-bed Change Using River Channel Characteristics and A Numerical Model (하도특성량과 수치모형에 의한 하상변동 예측)

  • Yoon, Yeo Seung;Ahn, Kyeong Soo
    • Journal of Wetlands Research
    • /
    • v.9 no.3
    • /
    • pp.51-61
    • /
    • 2007
  • In natural river, river-bed change is greatly influenced by the various factors such as river improvement, change of watershed land use, construction of dam and reservoir, gravel mining, and so on. The knowledge about river-bed change in the river is essential in the river modification, wetlands plan, and maintaining stable alluvial rivers. In this study, river-bed change in the future was predicted by investigating river channel characteristics which play dominant role in the formation of channel and based on the numerical model through river survey and the grain size analysis. The Proposed investigation and model was applied to the Geum river and the Miho stream which have been experienced river degradation due to river aggregate dredging and now seams to be stable. The result of potential river-bed change which was estimated by investigating channel characteristic including slope of channel, friction velocity, and so on is similar to that which was estimated based on the numerical model. It was found that the Geum river and the Miho stream will be stable. In the future, if considering the characteristics of river channel which is estimated by the river-bed scour, sediment, and so on, it is possible that river improvement and wetland restoration plan are established stably and naturally.

  • PDF