Abstract
Korea is located in a monson area, so that 2/3 of precipitation is fallen down in rainy season and dry season has few rainfall. Also, water quality gets worse during dry season by shortage of water. In this paper, the method, which is a physical way to improve water quality by dilution through over supplied water from big reservoir or dam, is analyzed at Han-river basin. For the sake of the analysis, the basin is divided in 33 catchments and each catchments' natural flow is simulated by SWAT-K and the future water demand is estimated by using statistics data. It is considered that Han-river basin has two big reservoirs(Chung-ju dam, So-yang gang dam) and potential discharge by dam is calculated through case of supply water from each dam and supply water from both dams.
우리나라는 강우량의 편기 현상으로 6월부터 9월중에 전체 강우량의 2/3가 내리고 있으며 갈수기에는 극히 적은 강우가 발생하고 있다. 또한 이러한 갈수기에는 물 부족으로 인하여 수질이 악화되는 문제까지 발생하고 있다. 본 연구에서는 갈수기에 발생하는 수질 악화현상을 방지하기 위해 저수지로부터 하천 유하량을 증가시켜 희석을 통한 수 질개선효과를 얻을 수 있는 방법에 대하여 한강유역을 대상으로 분석하였다. SWAT-K를 이용하여 한강유역을 총 33개의 소유역으로 구분하였으며, 각 소유역에서 발생되는 자연유출량을 모의하였다. 또한 용수수요량은 과거 용수 사용량 자료를 이용하여 추정하였다. 한강유역에서 유량을 공급하는 대규모 저류지는 남한강과 북한강에서 각각 한 개씩의 다목적댐(충주댐, 소양강댐)이 있는 것으로 고려하였으며, 각각의 댐에서 물을 공급하는 경우와 동시에 공급하는 경우에 대하여 댐 용수공급 가능유하량을 분석하였다.