A Study on the Estimation of Proper Numbers of Construction Lifts

건설 리프트의 적정 대수 산정에 관한 연구

  • 김선국 (경희대학교 산학협력기술연구원) ;
  • 한갑규 (경희대학교 건축공학과)
  • Published : 2008.06.25

Abstract

The volume of material and number of workers mobilized has been on the rise in line with the domestic projects getting higher, larger and complex currently. Particularly for the project in downtown, delivering the resources in timely manner is very crucial in carrying out the overall project as scheduled. Inappropriate lifting plan often causes inefficiency over the entire project, resulting in increase in schedule and cost. Despite of such importance of lifting plan for architectural work, lifting plans at the most of domestic projects, except a few cases for large scale high-rise buildings, have been heavily dependent on engineer's personal experience and intuition alone. To deal with such problems, the study was intended to develop and suggest a systematic and objective process for determining the lift, categorizing the lifting equipment into the two types, one for workers and another for material.

Keywords

References

  1. 김동진, 송영석, 임형철, 고층건축공사의 리프트 양중계획 합리화, 대한건축학회 추계학술발표대회 논문집, 제22권 제2호, pp.483-486, 2002.10
  2. 김정진, 최인성, 초고층 건축공사의 양중계획 시스템에 관한 연구, 한국건축시공학회, 제5권 제4호, pp.121-129, 2005. 12 https://doi.org/10.5345/JKIC.2005.5.4.121
  3. 박길재, 장명훈, 이현수, 고층 건축공사에 있어 자재양중계획의 최적화방안, 대한건축학회 추계학술발표대회 논문집, 제21권 제2호, pp.515-518, 2001.10
  4. 안병주, 김재준, 고층건물공사 마감자재의 수직.수평이동계획이 통합된 의사결정모델, 한국건설관리학회 논문집, 제2권 제2호, pp.47-58, 2001.6
  5. 오세욱, 김명호, 김영석, 건설생산성 관리 시스템 구축을 위한 데이터웨어하우스의 적용, 한국건설관리학회, 제7권 제2호, pp.127-137, 2006.4
  6. 이중석, 허영기, 안방률, 건설기계 연간표준가동시간 산정에 관한 연구, 한국건축시공학회 논문집, 제8권, 제1호, pp.37-42, 2008.2 https://doi.org/10.5345/JKIC.2008.8.1.037
  7. 이치주, 김재준, 이윤선, 계층분석법(AHP)을 이용한 마감공정의 계획 및 관리요인 분석에 관한 연구 / 초고층 주거건축물 공사 건식벽체공법을 대상으로, 한국건설관리학회, 제8권 제1호, pp.132-140, 2007.2
  8. 이현수, 채희동, 장명훈, 고층건축공사의 타워크레인 계획 프로세스 개발, 제18권, 제6호, pp.119-126, 2002.6
  9. 정용찬, 구교진, 현창택, 고층건축공사의 리프트 양중계획 합리화 방안, 대한건축학회 춘계학술발표대회 논문집, 제24권 제1호, pp.451-418, 2004.12
  10. 채희동, 장명훈, 이현수, 고층 건축공사의 양중 계획 지원 프로세스 개발, 제21권, 제1호, pp.457-460, 2001.4
  11. 최광수, 김학길, 김용수, 건설용 리프트의 사용실태 조사 및 문제점 분석에 관한 연구, 대한건축학회 추계학술발표대회 논문집, 제22권 제2호, pp.479-482, 2002.10
  12. 한국산업안전공단 홈페이지 (http://www.kosha.or.kr/)
  13. Kuo-Liang Lin, Carl T. Haas,(1996), Multiple Heavy Lifts Optimization, Journal of Construction Engineering and Management, ASCE Vol 122. No. 4, 1996
  14. Zhang, P., Harris, F.C., Olomolaiye, P.O. Holtlocation, G. D., Location Optimization for a Group of Tower Cranes, ASCE Vol 125. No. 2, 1999

Cited by

  1. An Analysis of The Critical Risk Factors in Failure Cases of Lifting Equipment Plans in High-rise Construction Project vol.14, pp.4, 2013, https://doi.org/10.6106/KJCEM.2013.14.4.073
  2. A Prediction Method of Vertical Lifting Loads Based on Long-term Time Series Analysis for High-rise Building Construction vol.196, 2017, https://doi.org/10.1016/j.proeng.2017.07.181
  3. Study on Optimization for Construction Vertical Lifting with Transfer Operation for Super High-rise Buildings vol.15, pp.6, 2014, https://doi.org/10.6106/KJCEM.2014.15.6.053
  4. Estimating Proper Number of Equipment for Ordinary Road Management Operations vol.16, pp.4, 2014, https://doi.org/10.7855/IJHE.2014.16.4.035
  5. Development of Optimum Construction Lift Operation System using Sensing Information for High-rise Building vol.14, pp.5, 2013, https://doi.org/10.6106/KJCEM.2013.14.5.153
  6. A Study on Method of Vertical Zoning of Construction Lift for High-rise Building based on Lift Planning & Operation History Database vol.22, pp.8, 2018, https://doi.org/10.1007/s12205-017-1374-3