Project Portfolio Evaluation Problem-Based on the Initial Construction and Periodic Revision Under Uncertainty

프로젝트 포트폴리오 평가문제 - 불확실성 하의 최초 구성 및 주기적 개정을 중심으로

  • 남재덕 (숭실대학교 대학원 경영학과) ;
  • 안태호 (숭실대학교 경영학부) ;
  • 윤정선 (국민대학교 경영학부)
  • Published : 2008.12.31

Abstract

This paper deals with modelling and introducing of the project portfolio construction and evaluation problem under uncertainty. The common way in industry of managing project portfolio is construction of initial portfolio considering uncertainties which exist inside and outside of portfolio, and periodic revision of portfolio due to the deviation from plans. In this paper, we introduce algorithm which reflecting the industrial common practice of initial planning and periodic revision. With this simulation method, probabilistic distribution of portfolio's performance in consideration can be found.

이 연구는 불확실성 하에서 프로젝트 포트폴리오 구성 및 평가를 모델링하고 알고리즘을 소개한다. 실제로 산업계에서 프로젝트 포트폴리오를 관리하는 방법은 포트폴리오 내외적으로 존재하는 불확실성을 감안하여 초기계획을 수립하고 목표 대비 실적을 감안하여 주기적으로 계획을 수정한다. 본 연구는 초기 계획 수립 및 주기적 개정이라는 산업계의 관리 방식을 반영하는 알고리즘을 개발하였으며, 시뮬레이션을 반복적으로 수행함으로서 관리하고자 하는 포트폴리오 성과의 확률적 분포를 구할 수 있다.

Keywords

References

  1. 안태호, "실무 적용성 제고를 위한 R&D Portfolio 모형 확정 연구", 대한경영정보학회지, 제19호, pp. 1-15, 2006
  2. 안태호, "프로젝트 일정관리 기법을 활용한 전략적 의사결정모형", 대한경영정보학회지, 제13호, pp. 127-140, 2003
  3. 안태호, 민택기, "프로젝트 포트폴리오 평가문제: 시뮬레이션을 이용한 다속성 평가를 중심으로", 한국경영공학회지, 제13권, 제1호, pp. 233-253, 2008
  4. Ahn, B.S., Park, K.S., Han, C.H. and Kim, J.K., "Multi-attribute Decision Aid Under Incomplete Information and Hierarchical Stmcture", European Jownal of Operational Research, pp. 431-439, 2000
  5. Chen, J. and Askin, R.G., "Project Selection, Scheduling and Resource Allocation with Time Dependent Returns", European Journal of Operational Research, 193, pp. 23-34, 2008 https://doi.org/10.1016/j.ejor.2007.10.040
  6. Cooper, R. G., Edgett, S. J. and Kleinschmidt, E., "Portfolio Management for New Products", Reading, MA; Addision-Wesley, 1998
  7. Eugene B. Lieb(1998), "How Many R&D Projects to Develop?", IEEE Transaction on Engineering Management, Vol. 45, No. 1 https://doi.org/10.1109/TEM.1998.728589
  8. Ghasemzadeh, F. and Archer, N.P., "Project Portfolio Selection through Decision Support", Decision Support System, Vol. 29, Issue 1, pp. 73-88, 2000 https://doi.org/10.1016/S0167-9236(00)00065-8
  9. Ringuest, J. L., "Conditional Stochastic Dominance in R&D Portfolio Selection", IEEE Transaction on Engineering Management, Vol. 47, 2000
  10. Saad, Roussel, P., K. and Erickson, T., "Third Generation R&D: Managing the Link to Coporate Strategy", Harvard Business School Press, Cambridge, MA, 1991
  11. Stummer, C., "Interactive R&D Portfolio Selection Considering Multiple Objective, Project Interdependencies, and Time: A Three-Phase Approach", Management of Engineering and Technology, 2001