References
- Baker, N. R. and Freeland, J. R. (1975), Recent Advances in R&D Benefit Measurement and Project Selection Methods, Management Science, 21(5), 1164-1175 https://doi.org/10.1287/mnsc.21.10.1164
- Brown, W. B. and Gobeli, D. (1992), Observation on the Measurement of R&D Productivity: A Case Study, IEEE Transaction on Engineering Management, 39(4), 325-331 https://doi.org/10.1109/17.165414
- Chester, A. N. (1995). Measurements and Incentives for Central Research, Research Technology Management, 38(4), 14-22
- Cho, K, T. (2003), Analytic Hierarchy Process, Donghyun Publishing Company, Seoul, Korea
- Fahrni, P. (1990), An Application-Orienred Guide to R&D Project Selection and Evaluation Methods, R&D Management, 20(2), 155-171 https://doi.org/10.1111/j.1467-9310.1990.tb00693.x
- Keller, R. T. and Holland, W. E. (1982), The Measurement of Performance among Research and Development Professional Employees: A Longitudinal Analysis, IEEE Transaction on Engineering Management, 29(2), 54-57
- Lee, J. W. (2001), R&D Project Evaluation, Science& Technology Policy
- Saaty, T, L. (1994), How to Make a Decision; Analytic Hierarchy Process, Interfaces, 24(6), 19-43 https://doi.org/10.1287/inte.24.6.19
- Saaty, T. L. (1980), The Analytic Hierarchy Process, McGraw-Hill, NewYork
- Samsung Electro-Mechanics (2006), R&D Management Regulations
- Vargas, L. G. (1990), An Overview of the Analytical Hierarchy Process and Its Applications, European Journal of Operational Research, 48(1), 2-8 https://doi.org/10.1016/0377-2217(90)90056-H
- Zahedi, F. (1986), The Analytic Hierarchy Process - A Survey of the Method and Its Applications, Interfaces, 16(4), 96-108