참고문헌
- Benjaafar, S. (1996), On production batches, transfer batches and lead times, IIE Transactions, 28, 357-362 https://doi.org/10.1080/07408179608966282
- Goldratt, E. M. and Cox, J. (1984), The Goal: A Process of Ongoing Improvement, The North River Press, Great Barrington, MA, USA
- Goldratt, E. M. (1990), The Haystack Syndrome, North River Press, Croton-On-Hudson, NY, USA
- Karmarkar, U. S. (1987), Lot sizes, lead time and in-process inventories, Management Science, 33(3), 409-418 https://doi.org/10.1287/mnsc.33.3.409
- Karmarkar, U. S., Kekre, S., and Kekre, S. (1992), Multi-item batching heuristics for minimization of queue delays, European Journal of Operational Research, 58, 99-11 https://doi.org/10.1016/0377-2217(92)90239-6
- Kenyon, G., Canel, C., and Neureuther, B. D. (2005), The impact of lot-sizing on net profits and cycle times in the n-job, m-machine job shop with both discrete and batch processing, International Journal of Production Economics, 97(3), 263-278 https://doi.org/10.1016/j.ijpe.2004.07.007
- Kuik, R. and Tielemans, P. F. J. (1998), Analysis of expected queueing delays for decision making in production planning,, European Journal of Operational Research, 110, 658-681 https://doi.org/10.1016/S0377-2217(97)00324-X
- Kuik, R. and Tielemans, P. F. J. (1999), Lead-time variability in a homogeneous queueing model of batching, International Journal of Production Economics, 59, 435-441 https://doi.org/10.1016/S0925-5273(98)00029-2
- Kuik, R. and Tielemans, P. F. J. (2004), Expected time in system analysis of a single-machine multi-item processing center, European Journal of Operational Research, 156, 287-304 https://doi.org/10.1016/S0377-2217(03)00022-5
- Meng, G. (2004), Batch size model in a multi-item, discrete manufacturing system via an open queueing network, IIE Transactions, 36(8), 743-751 https://doi.org/10.1080/07408170490458508
- Solberg, J. J. (1980), CAN-Q user guide: the optimal planning of computerized manufacturing systems, Report No.9, School of Industrial Engineering, Purdue University, West Lafayette, IN, USA
- Shanthickumar, J. G. and Buzacott, J. A. (1981), Open queueing network models of dynamic job shops, International Journal of Production Research, 19(3), 255-266 https://doi.org/10.1080/00207548108956652
- Srikanth, M. L. and Umble, M. (1997), Synchronous Management: Profit-Based Manufacturing for the 21st Century, The Spectrum Publishing Company, USA
- Tielemans, P. F. J. and Kuik, R. (1996), An explanation of models that minimize leadtime through batching of arrived orders, European Journal of Operational Research, 95, 374-389 https://doi.org/10.1016/0377-2217(95)00258-8
- Umble, M. M and Srikanth, M. L. (1993), Synchronous Manufacturing, The Spectrum Publishing Company, Wallingford, Conneticut, USA
- Whitt, W. (1983), The queueing network analyzer, The Bell System Technical Journal, 62(9), 2779-2815 https://doi.org/10.1002/j.1538-7305.1983.tb03204.x