References
- 김기영, 이정호, 강창호, 김갑환, 주문형 반도체 웨이퍼 공정분석을 위한 시뮬레이션 연구, IE Interface, 18(1), 22-34, 2005
- Corsten, H., R. Gossinger and N. Wolf, Flexibility-driven Order Releases in Job-Ship Production, Technovation, 25, 815-830, 2005 https://doi.org/10.1016/j.technovation.2004.01.011
- Dabbas, R. M., H. N. Chen, J. W. Fowler, and D. Shunk, A Combined Dispatching Criteria Approach to Scheduling Semiconductor Manufacturing System, Computers & Industrial Engineering, 39, 307-324, 2001 https://doi.org/10.1016/S0360-8352(01)00008-0
- Donselaar, K. H. and B. J. Gubbels, How to Release Orders in order to Mininmize System Inventory and System Nervousness?, International Journal of Production Economics, 78, 335-343, 2002 https://doi.org/10.1016/S0925-5273(01)00209-2
- Huang, M., D. Wang and W. H. Ip, Simulation Study of CONWlP for a Cold Rolling Plant, Int.J. Production Economics, 54, 257-266, 1998 https://doi.org/10.1016/S0925-5273(97)00152-7
- Kang,J., A Method for Target Scheduling of Semiconductor Wafer Fabfrication Based on Event-Based Optimization Modeling and Disctete Event Simulation, Ph.D. thesis, University of California, Berkeley, 1996
- Kim, J., R. C. Leachman, and B. Suh, Dynamic Release Control Policy for the Semiconductor Wafer-fabrication Lines, JORS, 47, 1516-1525, 1996 https://doi.org/10.1057/jors.1996.195
- Kim, K. Y, K. H. Kim, C. H. Kang, Estimating Lead Times of Orders in a Semiconductor Wafer Manufacturer, The Proceedings of the 33th International Conference on Computers and Industrial Engineering, CD CIE024, 6 pages,Jeju, Korea, March 25-27, 2004
- Kingsman, B. G., Modeling Input-Output Workload Control for Dynamic Capacity Planning in Production Planning Systems, International Journal of Production Economics, 68, 73-93, 2000 https://doi.org/10.1016/S0925-5273(00)00037-2
- Koh, S.C.L. and S.M. Saad, The Use of Intelligent Feedback for Work Order Release in an Uncertain Manufacturing System, Robotics and Computer-Integrated manufacturing, 20, 517-527,2004 https://doi.org/10.1016/j.rcim.2004.07.006
- Ooijen, H.P.G. and J.W.M. Bertrand, Economic Due-date Setting in Job-Shop based on Routing and Workload Dependent Flow Time Distribution Function, International Journal of Production Economics, 74, 261-268, 2001 https://doi.org/10.1016/S0925-5273(01)00131-1
- Oosterman, B., M. Land, and G. Gaalman, The Influence of Shop Characteristics on Workload Control, International Journal of Production Economics, 68,107-119,2000 https://doi.org/10.1016/S0925-5273(99)00141-3
- Land, M. and G. Gaalman, Workload Control Concepts in Job Shops: A Critical Assessment, International Journal Production Economics, 46-47, 535-548, 1996
- Lee, Y S., S. Y. Kim, S. H. Yea, and B. K. Kim, 'Production Planning in Semiconductor Wafer Fab Considering Variable Cycle Times,' Computers ind. Engng, 33(3-4), 713-716, 1997 https://doi.org/10.1016/S0360-8352(97)00049-1
- Lin, C. Y., Shop Floor Scheduling of Semiconductor Wafer Fabrication Using Real-Time Feedback Control and Predictions, doctoral dissertation, University of California at Berkeley, 1996
- Raaymakers, W. H. M., J. W. M. Bertrand, and J. C. Franscoo, Makespan Estimation in Batch Process Industries Using Aggregate Resource and Job Set Characteristics, International Journal of Production Economics, 70, 145-161, 2001 https://doi.org/10.1016/S0925-5273(00)00052-9
- Shen, Y., Stochastic Wafer Fabrication Scheduling, Ph.D. thesis, University of California, Berkeley, 1997
- Sivakumar, A. Land C. S. Chong, A Simulation based Analysis of Cycle Time Distribution, and Throughput in Semiconductor Backend Manufacturing, Computers in Industry, 45, 59-78, 2001 https://doi.org/10.1016/S0166-3615(01)00081-1
- Sloan, T. W., Scheduling Semiconductor Wafer Manufacturing Using In-Line Equipment Condition and Yield Information, Ph.D. thesis, University of California, Berkeley, 1998
- Sung, C. S. and Y. I. Choung, Minimizing Makespan on a Single Burn-in Oven in Semiconductor Manufacturing, European Journal of Operational Research, 120,559-574,2000 https://doi.org/10.1016/S0377-2217(98)00391-9
- Vargas-Villamil, F. D. and D. E. Rivera, Multilayer Optimization and Scheduling Using Model Predictive Control: Application to Reentrant Semiconductor Manufacturing Lines, Computers and Chemical Engineering, 24, 2009-2021, 2000 https://doi.org/10.1016/S0098-1354(00)00598-6
- Weng, Z. K., Manufacturing Lead Times, System Utilization Rates and Lead-Time Lelated Demand, European Journal of Operational Research, 89, 259-268, 1996 https://doi.org/10.1016/0377-2217(95)00268-5