- Johannessen, S. and O. Askilsrud, 1993, Mer!lker HydroTunnelling the Norwegian way, Proc. RETe 1993
- NTNU, 1988, Project Report 1-88, Hard rock tunnel boring, NTNU
- NTNU, 1994, Project Report 1-94, Hard rock tunnel boring, NTNU
This paper presents an article explaining a TBM project overall in Norway. The paper which published in Norwegian TBM Tunnelling by Norwegian Soil and Rock Eng. Assoc. in 1998, contains most of the items considered in TBM tunnelling. New powerplants, tunnels and dams have been built at Meraker in Central Norway. A total of 44 km of tunnels with cross sections varying from
본보는 1998년 노르웨이 토질암반공학협회에서 일회 발간한 Norwegian TBM Tunnelling 전문지에 수록된 논문을 소개하는 기술보고서이다. 노르웨이 중부 Meraker 지방에 새로운 수력발전사업이 진행되어, 발전소 및 터널, 댐이 건설되었다. 단면적이