The underground research tunnel, which is under construction in KAERI for the validation of HLW disposal system, is excavated in a granite rock by drill&blasting. In order not to disturb the operation at the research facilities including Hanara reactor by the blasting for the excavation of $6m{\times}6m$ tunnel, a test blasting at the site was performed. Using the vibration equation derived from the test blasting, it was possible to predict the vibration at different locations at KAERI and to conclude that the blasting design would meet the design criteria at the major facilities in KAERI. The noise and vibration generated by the main blasting were continuously measured. In the case of vibration, the measured values were lower than the predicted one from the vibration equation. It is, therefore, concluded that the influence of blasting work for the construction of 280m long research tunnel on the major facilities in KAERIl would be insignificant.

고준위폐기물 처분시스템의 거동 실증을 위해 한국원자력연구소내에 추진되고 있는 지하처분연구시설은 고성능 폭약을 이용한 발파 기법에 의해 지하 화강암반내에 건설된다. $6m{\times}6m$ 크기의 터널을 굴착하기 위한 발파에 의한 진동 및 소음이 인접한 연구시설 및 하나로 원자로에 영향을 예측하기 위한 시험 발파가 실시되었다. 시험발파를 통해 얻어진 발파진동식을 이용한 원자력연구소내 주요시설에 대한 발파영향을 평가결과 설계기준에 비해 훨씬 낮은 것으로 파악되었다. 굴착 진행에 따른 소음, 진동값을 측정하였으며 진동값의 경우 발파진동식으로 추정한 값보다 더 낮게 나타났다. 따라서 원자력연구소내 지하에 280m 규모의 처분연구시설을 건설하기 위한 발파작업으로 연구소내 주요 시설에 미칠 영향은 미미할 것으로 판단된다.

Keywords

References

  1. 권상기, 김경수, 박정화, 조원진, 2004a, 원자력 연구소내 처분지하연구시설에 대한 3차원 구조 안정성 해석, KAERI/TR-2688/2004
  2. 권상기, 박정화, 조원진, 2004b, 원자력연구소내 처분지하연구시설 부지의 지반 특성, KAERI/TR-2805/2004
  3. 조원진, 박정화, 권상기, 2004a, 소규모 지하처분연구시설 부지조사 및 평가, KAERI/TR-2751/2004
  4. 조원진, 박정화, 권상기, 2004b, 소규모 지하처분연구시설 기본설계, KAERI/TR-2769/2004