Design of a Continuous Screening Procedure in the Bivariate Normal Model

이변량 정규모형 하에서 연속생산형 스크리닝 절차의 설계

  • Hong, Sung Hoon (Department of Industrial and Information Systems Engineering, Chonbuk National University)
  • 홍성훈 (전북대학교 산업정보시스템공학과)
  • Published : 2005.06.30

Abstract

A quality inspection procedure interchangeably using the performance and surrogate variables is proposed. At the start of the inspection, the continuous performance variable is measured for all items. As soon as iconsecutive items are found to be conforming, the continuous surrogate variable is measured instead of the performance variable. If an item is rejected, the inspection based on the performance variable is resumed. It is assumed that the performance variable and the surrogate variable are jointly normally distributed with known means and standard deviations. The average outgoing quality (AOQ) expression is derived, and the methods of finding the inspection procedure with a specified average outgoing quality limit (AOQL) are presented.

Keywords

References

  1. Bai, D.S. andHong, S.H. (1992), Economic Screening Procedures Using a Correlated Variable with Multidecision Alternatives, Naval Research Logistics 39(4),471-485 https://doi.org/10.1002/1520-6750(199206)39:4<471::AID-NAV3220390404>3.0.CO;2-I
  2. Bai, D.S. and Kwon, H.M. (1995), Economic Design of a Two-Stage Screening Procedure with a Prescribed Outgoing Quality, Metrika 42(1), 1-18 https://doi.org/10.1007/BF01894285
  3. Bai, D.S., Kwon, H.M., and Lee, M.K. (1995), An Economic Two-Stage Screening Procedure with a Prescribed Outgoing Quality in Logistic and Normal Models, Naval Research Logistics 42(7), 1081-1097
  4. Boys, R.I. and Dunsmore, I.R. (1987), Diagnostic and Sampling Models in Screening, Biometrika 74(2),356-374
  5. Dodge, H.F. (1943), A Sampling Inspection Plan for Continuous Production, Annals of Mathematical Statistics 14(3),264-279 https://doi.org/10.1214/aoms/1177731420
  6. Hong, S.H. and Elsayed, E.A. (1998), Economic Complete Inspection Plans with Multi-Decision Alternatives, International Journal of Production Research 36(12), 3367-3378 https://doi.org/10.1080/002075498192102
  7. Hong, S.H., Kim, S.B., Kwon, H.M., and Lee, M.K. (1998), Economic Design of Screening Procedures When the Rejected Items are Reprocessed, European Journal of Operational Research 108(1),65-73 https://doi.org/10.1016/S0377-2217(97)00204-X
  8. Hong, S.H., Lee, M.K., Kwon, H.M., and Kim, S.B. (2001), A Continuous Screening Procedure Using the Performance and Surrogate Variables, International Journal of Production Research 39(11), 2333-2340 https://doi.org/10.1080/00207540110040439
  9. Hui, Y.V. (1990), Economic Design of a Complete Inspection for Bivariate Products, International Journal of Production Research 28(2),259-265 https://doi.org/10.1080/00207549008942708
  10. Kim, C.T., Tang, K., and Peters, M. (1994), Design of a Two Stage Procedure for Three-Class Screening, European Journal of Operational Research 79(3),431-442 https://doi.org/10.1016/0377-2217(94)90057-4
  11. Kwon, H.M., Hong, S.H., Lee, M.K., and Kim, S.B. (2001), A Process Monitoring Procedure Based on a Surrogate Variable for Dichotomous Performance Variable, IIE Transactions 33 (12),1129-1133
  12. Lee,M.K. and Elsayed, E.A. (2002), Process Meanand Screening Limits for Filling Processes under Two-Stage Screening Procedure, European Journal of Operational Research 138(2), 118-126 https://doi.org/10.1016/S0377-2217(01)00128-X
  13. Lee, M.K., Hong, S.H., and Elsayed, E.A. (2001), The Optimum Target Value under Single and Two-Stage Screenings, Journal of Quality Technology 33(4),506-514
  14. Li, L. and Owen, D.B. (1979), Two-Sided Screening Procedures in the Bivariate Case, Technometrics 21(1), 79-85 https://doi.org/10.2307/1268583
  15. Ng,W.C. andHui, Y.V. (1996), Economic Design of a Complete Inspection Plan with Interactive Quality Improvement, European Journal of Operational Research 96(1), 122-129
  16. Owen, D.B., McIntire, D. and Seymour, E. (1975), Tables Using One or Two Screening Variables to Increase Acceptable Product Under One-Sided Specifications, Journal of Quality Technology 7(3), 127-138
  17. Riew, M.C. (1989), Economic Selection of Specification Limits for a Given Target Value, Journal of the Korean Institute of Industrial Engineers 15(2),57-64
  18. Tang, K. (1987), Economic Design of a One-Sided Screening Procedure Using a Correlated Variable, Technometrics 29(4), 477-485 https://doi.org/10.2307/1269460
  19. Tang, K. (1988a), Economic Designof Product Specifications for a Complete Inspection Plan, International Journal of Production Research 26(2), 203-217 https://doi.org/10.1080/00207548808947854
  20. Tang, K. (1988b), Design of a Two-Stage Screening Procedure Using Correlated Variables: A LossFunction Approach, Naval Research Logistics 35(5),513-533 https://doi.org/10.1002/1520-6750(198810)35:5<513::AID-NAV3220350514>3.0.CO;2-7
  21. Tang, K. and Tang, J. (1994), Designof Screening Procedures: A Review, Journal of Quality Technology 26(3), 209-226
  22. Turkman, K.F. and Turkman, M.A.A. (1989), Optimal Screening Methods, Journal of the Royal Statistical Society Series B 51(2),287-295
  23. Wong, A., Meeker, J.B., and Selwyn, M.R. (1985), Screening on Correlated Variables: A Bayesian Approach, Technometrics 27(4),423-431 https://doi.org/10.2307/1270209