A Case Study on the Verification of the Initial Layout of Engine Block Machining Line Using Simulation

엔진블럭 가공라인 초기설계안 검증을 위한 시뮬레이션 사례연구

  • 문덕희 (창원대학교 산업시스템공학과) ;
  • 성재헌 (통일중공업㈜ 메카트로닉스기계기술연구소) ;
  • 조현일 (창원대학교 산업시스템공학과)
  • Published : 2003.09.01

Abstract

The major components of an engine are engine block (or cylinder block), cylinder head, crank shaft, connecting rod and cam shaft. Thus the engine shop usually consists of six sub-lines, five machining lines and one assembly line. Flow line is the typical concept of layout for machining these parts, especially for engine block. In order to design an engine block machining line, several factors should be considered such as yearly production target, working hours, machines, tools, material handling equipments and so on. If the designers of manufacturing line were unaware of some factors those would be influenced on the system performance, it would make greater problems in the phase of mass production. Therefore the initial design of engine block machining line should be verified carefully. Simulation is the most powerful tool for analyzing the initial layout. This paper introduces the major factors those should be considered for designing the machining line and their effects on the system performance. 3D simulation models are developed with QUEST. Using the simulation model developed the initial layout is analyzed, and we suggest some ideas for improvement.

Keywords

References

  1. Proceedings of the 2002 Winter Simulation Conference A Simulation Study of an Automative Founry Plant Manufacturing Engine Blocks Choi;S.D.Kumar A.R.;Houshyar A
  2. Computes & Operatons Research v.29 Bufer Allocation in flow-shop-type Production Systems with General Arrival and Service Pattern Huang;M.G;Chang;P.L;Chou;Y.C
  3. Manufacturing Engineering v.117 no.5 Simulating an Engine Plant Jayaraman;A;Agarwal A
  4. Proceedings of the 1997 Winter Simulation Conference Applications of discrete Event Simulation in the Design of automotive Powertrain Manufacturing Systms Jayaraman;A;gunal;A.K
  5. Int.J. of Prouction Research v.31 no.3 A Two-phase Heuristic Algorithm for Determining Buffer Sizes of Production Lines Park;T
  6. 한국시뮬레이션학회 '99 춘계학술대회 논문집 엔진블럭 가공라인의 물류분석 김상훈;오필범;송강섭;우상복;한형상
  7. 한국시뮬레이션 학회 논문지 v.9 no.1 시뮬레이션을 사용한 엔진생산라인의 설계개선 오필범;임석철;한형상
  8. Proceedings of the European Simulation Symposium, Society of Computer Simulation International The Role of Simulation in Desigh and Operation of Body and Paint Shops in Vehicle Assembly Plants Ulgen;O;gunal;A;Grajo;E;Shore;J
  9. Facilities Planning (2nd Ed) Tompkins;J.A;White;J.A;Bozer;Y.A;Frazelle;E.H;Tanchoco;J.M.A;Trevino;J