볼랜드식 어도 운영을 위한 유지수량 결정

Determination of Flow Rate for Operation of the Borland Fishlock

  • 발행 : 2001.06.30

초록

The purpose of this study is to determine flow rate for operation system of the Borland fishlock. The fish ladder is usually constructed at the diversion weir crossing the river. But, at the place of the high dam, the fish ladder is very difficult to keep

키워드