초록
Effect of the addition of an enzyme/microbial additive(EMA) to enhance anaerobic digestion of the primary sludge was investigated. Two laboratory scale anaerobic digester were operated with primary sludge taken from a municipal wastewater treatment plant. The digester receiving EMA with the sludge feed performed better than the control digester, when both were operated at 10-days and 15-days Solid Retention Time(SRT). Addition of EMA to the experimental digester provided 7%(10-days SRT) and 16%(15-days SRT) higher gas production compared to the control digester when both were fed with the same amount of volatile solids. The reduction in volatile solids was 24% better in the experimental digester compared to the control ar 10-days SRT, and the improvement 10% at 15-day SRT. Improvement in COD reduction, and fecal coliform density reduction were also seen in the experimental digester due to EMA addition compared to the control both ar 10-days SRT and 15-day SRT operation. Preliminary cost benefit analysis for a wastewater treatment plant showed that approximately $115/day in gas production improvements can be realized upon addition of EMA to primary sludge anaerobic digesters operating at 10-day SRT. The value of increased gas production was $172/day if the same digesters are operated with EMA addition at 15-day SRT.