농어촌정비사업 공종별 실적공사비 적산시스템개발

Development of Cost Estimate System Based on the Itemized Historical Data for Rural Improvement Projects

  • 발행 : 1998.06.01

초록

Cost estimate system Will be changed from the prime. cost calculation to the historical cost data because the present system has some problems. In this situation, each owner should prepare his own cost estimate system based on the historical cost data. In this study, the standard work items were classified and the criteria of their work amount computation were established for rural improvement projects. And also the historical cost data were collected in all range of rural improvement projects, and the database system, "HICOMS" (HIstorical COst data Management System) was built. In order to test the applicability of the HICOMS, standard work cost and contractor cost were compared. The results by HICOMS showed high significance and it was concluded that the HICOMS could be applicable for the cost estimate of the rural improvement projects. projects.

키워드

참고문헌

  1. 적산제도 변경에 따른 농어촌정비사업 실적공사비 적산시스템개발(Ⅰ) 농어촌진흥공사
  2. 적산제도 변경에 따른 농어촌정비사업 실적공사비 적산시스템개발(Ⅱ) 농어촌진흥공사
  3. 실적공사비 해외출장 결과보고서 농어촌진흥공사
  4. 품셈 미정립분야 적용요령(토목 부문) 농어촌진흥공사
  5. 적산제도 개선방안 연구용역(2,3,4 단계) 건설기술연구원
  6. 실적공사비 축적 및 적용방안 연구보고서(1차분) 건설기술연구원
  7. 토목공사 수량산출기준 건설기술연구원
  8. 표준품셈(토목) 건설부
  9. 국가를 당사자로하는 계약에 관한 법률,동법시행령,동법시행규칙
  10. 建設省土木工事積算基準 建設行政出版 センタ一
  11. CESMM3; Civil Engineering Standard Method of Measurement(3rd ed.) Thomas Telford
  12. Specifications and Costs(Ⅱ),(3rd ed.) Elwyn,E.Seelye