Computational Maintenance on the Official Coordinates Revision in the Korean Triangulation Stations

국가삼각점 성과의 갱신방안에 관한 연구

  • 최재화 (성균관대학교 공대 토목공학과) ;
  • 이영진 (서울시립대학교 공대 토목공학과) ;
  • 최윤수 (안성산업대학 토목공학과)
  • Published : 1992.12.01

Abstract

The Korean triangulation network was established for 7 years from 1940 to 1916, the official coordinates of the stations were based on Tokyo Datum. But, most of the triangulation points, were destroyed during the Korean War, was re-established or re-arranged. The National Geography Institute(NGI) is now executing primary and secondary precise control survey projects with Electronic Distance Measuring equipments, which have average side lengths of 10 Km/2.5 Km. In this study, the revision method of the official coordinates is proposed that the combination of the primary and secondary precise control network is appropriate to new densification adjustments based on the computational schems of the original triangulation framework. And, the redefinition systems of Korean Datum is are also proposed in future networks.

동경원점을 기준계로 하고 있는 한국의 기설삼각망은 1910~1916년에 설정되었으나 6.25 동란으로 인하여 대부분의 삼각점이 손상되어 복구성과를 관리해 오고 있다. 따라서 실용면에서의 문제점 때문에 국립지리원에서는 EDM에 의해 평균변장 10 Km의 정밀 1차 기준점측량과 평균변장 2.5 Km의 정밀 2차 기준점 측량을 실시하고 있다. 본 연구에서는 기설삼각망의 기준체계를 유지하면서 이들 정밀 1차망과 정밀 2차망을 조합하고 통계적으로 안정된 1, 2등 삼각점에 결합조정을 실시하여 실용성과를 갱신하는 방안을 제시하였다. 또한 독립적인 정밀 1차망 성과의 산정방안과 새로운 한국원점 성과의 구축방향에 대한 체계와 활용방안을 제안하였다.

Keywords