Journal of Korean Institute of Industrial Engineers (대한산업공학회지)
- Volume 13 Issue 2
- /
- Pages.97-103
- /
- 1987
- /
- 1225-0988(pISSN)
- /
- 2234-6457(eISSN)
The Effect of Short Production Runs on the Average Outgoing Quality of Skip-Lot Sampling Plan
Skip-Lot 샘풀링 검사(檢査)에서 생산기간(生産期間)이 평균출검품질(平均出檢品質)에 미치는 영향
Abstract
Skip-Lot sampling plan is formulated in terms of renewal process. This approach facilitates studying the average outgoing quality in a short production run of length t, AOQ (t). By numerical studies it is found that the long-run average outgoing quality (AOQ) greatly overestimates AOQ (t) for short runs.
Keywords