과제정보
연구 과제 주관 기관 : 한국과학원
In this paper, the employment planning model is developed which is a decision-making model for determining the optimum employment level with respect to varying net manpower requirement for each planing period such that total cost in a planning horizon is minimized. It is constructed as a nonlinear programming model and a dynamic programming model on the basis of studies in the areas of production smoothing and manpower scheduling. Costs for a planning period are categorized into regular wage cost, hiring cost, and overtime cost. The first is a linear function. The other two cost functions are of quadratic nature. The planning horizon of this planning model is intermediate range (five years) for which a fair planning accuracy can be guaranteed. The model considers learning period for each job class. It is simple and an optimum solution can be easily obtained by direct search techniques.
연구 과제 주관 기관 : 한국과학원