Study on the Application of Optionum Load Shedding

최적부하제한방식의 적용에 관한 연구

  • Published : 1975.03.01

Abstract

This paper describes the results of a study for the system characteristics, especislly for the abnormal frequency drop of power system, when a large generation unit such as Kori Nuclear 1 (595MW) pulls out from the system. The automatic load shedding method now adopted in our system was re-studied to ameliorate the above problem. From the results of the study, a new under-frequency relay with an element for detecting the slope of frequency change and with time delay element to raise the lowered frequency to a desired value, was found to be effective, and should be purchased and utilized. By this study, an optimal and concrete load shedding method was recommended for reliable operation of power system.