과제정보
본 논문은 국토교통부 디지털 기반 건축시공 및 안전감리 기술개발 사업(과제번호1615012983)의 지원으로 수행되었음.
The type and proportion of construction work varies depending on the stage of progress, and the frequency of inspection and defect occurrences are different. If it is determined to be defective after the inspection, a delay may occur, and additional manpower and resources are required. Therefore, it is necessary to prevent these risks by classifying, deriving, and managing key management woks according to the progress. This study aims to contribute to the efficiency of the supervisor's inspection work by identifying the types of construction that should be managed intensively for each construction progress and deriving the time when defects occur frequently in each construction type.
본 논문은 국토교통부 디지털 기반 건축시공 및 안전감리 기술개발 사업(과제번호1615012983)의 지원으로 수행되었음.