Acknowledgement
본 논문은 2021년 스마트건설기술개발사업(과제번호: 21SMIP-A158708-02), 도시건축연구사업(과제번호: 20AUDP-B106327-06)의 일환으로 수행된 연구임을 밝히며 이에 감사를 드립니다.
Earthwork is the starting work of construction process, which has the greatest impact on the productivity of the construction project among the works. However, it is difficult to derive accurate productivity becuase the earthwork plan is affected by geological condition of the jobsite. Therefore, a simulation model for productivity analysis of earthwork was developed using CYCLONE modeling method in this study. In this paper, simulation model was made considering the impact factors of earthwork productivity. The proposed model can be utilized for sensitivity analysis in future studies.
본 논문은 2021년 스마트건설기술개발사업(과제번호: 21SMIP-A158708-02), 도시건축연구사업(과제번호: 20AUDP-B106327-06)의 일환으로 수행된 연구임을 밝히며 이에 감사를 드립니다.