과제정보
The support of the Fundamental Research Funds for the Central Universities (Project No.106112016CDJXY030002) is gratefully acknowledged.
With the acceleration of construction industrialization, the buildings that China has adopted the construction of industrialization technology are increasing day by day, and Precast Concrete (PC) Structure technology is one of the main technologies of construction industrialization. Compared with the traditional cast-in-place concrete structure, PC structure is more conducive to shorten the construction period, reduce the number of construction workers and the site construction waste. Nevertheless, PC structure improves the requirements of hoisting machinery in the construction site, and the lay-out and selection of hoisting machinery become an important factor influencing the construction cost. The paper regards the typical tower crane in China as the research object, and establishes the time optimization model for the lifting scheme. The influence of the different precast rate on the selection of the tower crane is analyzed. This paper obtains the time variation of the tower crane under different precast rate, provides a theoretical basis for the design of precast concrete structures under the influence of assembly construction, and lays the foundation for the selection of tower crane under the precast rate.
The support of the Fundamental Research Funds for the Central Universities (Project No.106112016CDJXY030002) is gratefully acknowledged.