한국건축시공학회:학술대회논문집 (Proceedings of the Korean Institute of Building Construction Conference)
- 한국건축시공학회 2013년도 추계 학술논문 발표대회
- /
- Pages.4-7
- /
- 2013
지하구조물 역타공법 PRD공정이 삭제된 대안공법 제시
Downward Method of Underground Structures
- 발행 : 2013.11.15
초록
In recent downtown high land due to an increase in the utilization of land from the property line to maximize the proximity of the construction and use of underground structures has increased. The nature of urban underground retaining structure construction safety, environmental management, and civil contrast situations, construction periodt perspective, this method is widely used in the backhand. Recent Patents DP method and the method of the DBS method than in the SPS process is deleted according to the PRD process cost savings are generated. The workability and safety study of two kinds of method, such as air speed, and considering the reduction of indirect costs in terms of economic efficiency is considered to be a superior method.
키워드