Study of Tunnel Face Mapping Using Tunnel Mapper

Tunnel Mapper를 이용한 Tunnel 막장면 조사에 관한 연구

  • 곽노경 (서울시립대학교 토목공학과) ;
  • 조성진 ((주)경동기술공사) ;
  • 이송 (서울시립대학교 토목공학과)
  • Published : 2010.09.09

Abstract

Tunnel Mapper, which is tunnel face survey system was used to conduct Face Mapping on the face of the tunnel that is under construction. Then, accuracy and utility value on the forecast of discontinuity were verified to verify the field application in order to present the measures for the use of the system for conducting research on the discontinuity. As result of the directivity verification following discontinuity‘s project, forecasted measurement and actually researched measurement error for the Dip direction and Dip angle was less than ${\pm}10$. Accuracy was 82.6% for Dip direction and 90.7% for Dip angle, which are high. Accordingly, face research discontinuity forecasting system's reliability level towards directivity is high. Tunnel Mapper, a tunnel face survey system can be leveraged to replace face's visual survey and to obtain objective information, enabling execution of the survey system that can automate face survey going beyond time and space related limitations.

Keywords