Management and Reduction of Backfill Settlement for Bridge Abutments

고속도로 교대 뒤채움부 침하관리 방안

  • 최영철 (한국도로공사 도로교통연구원) ;
  • 임성윤 (한국도로공사 도로교통연구원)
  • Published : 2010.03.25

Abstract

To provide more safe road and better travelling service for Expressway customer, we minimize settlement of bridge backfill and properly repair the occurred settlement. So, we devide this study to two parts one is construction part and the other is management part, in construction part we remove settlement occuring elements and in management part we grasp proper repair time, and then we produce general settlement management program. In construction part, for the purpose of developing construction method of reducing settlement, we developed construction method models and they are composed of abutment back section alteration and backfill material alteration by literature reviews and site investigation of backfill settlement. And then, we carried out laboratory model test and full size field test of some developed models.

Keywords