Deduction or Importance Analysis for Pre-dispute Factors in the Constructions

건설공사 사전분쟁요인 도출 및 중요도 분석

  • 박성용 (동의대학교 건축공학과) ;
  • 고대준 (동의대학교 건축공학과) ;
  • 하봉균 (동의대학교 건축공학과) ;
  • 양진국 ((주)거성ENG건축사사무소 건설관리기술연구소) ;
  • 이상범 (동의대학교 건축공학과)
  • Published : 2008.11.07

Abstract

It's hard to express a lot of information within the drawings and the specifications as construction projects have gradually become large-size and complex. So, disputes are caused by that and reason that the usual practice(culture) of contract of the constructions in Korea is based on unfair rather than the fair principle between clients and contractors. However, the contractors don't try to solve this kind of things because they are worried about at their disadvantage situation. Therefore, this paper deduced the factors in the pre-dispute phase by analysing the cases of the civic counseling in the office of supply and the pre-dispute factors, and conduct analysis on the factors' importance by using AHP. The results will be used for a check-list to prevent the disputes.

건설공사는 점점 대형화되고 복합화됨에 따라 도면과 시방서만으로는 모든 정보를 표현하는 것이 어려우며, 불확정적인 요소를 계약서에 명문화하는 것의 한계성으로 인해 분쟁이 지속적으로 발생하고 있다. 또한 우리나라의 건설공사는 상호평등의 원칙보다는 발주자 위주의 계약관행이 존재하고 있어서 비합리적인 조항을 계약관련 서류에 포함시키는 등의 일이 발생하고 있다. 계약상의 불이행이나 불만이 발생하더라도 약자의 위치에 있는 시공자는 계약체결 경향과 건설업체의 후속공사 수주목적을 위해 자체적 클레임회피경향이 지배적이다. 이렇듯 겉으로 표출되지 못하는 분쟁의 요인들이 존재하는 것이다. 이에 본 연구에서는 겉으로 표출되지 못했던 사전분쟁단계에서의 요인들을 조달청의 민원상담사례를 분석하여 사전분쟁요인들을 도출하고, 계층분석적 의사결정방법(AHP)을 활용하여 도출된 요인들간 중요도 분석을 실시하였다. 이상의 분석된 결과는 차후 건설공사에서 분쟁예방을 위한 체크리스트로 활용이 가능할 것으로 사료된다.

Keywords