Study on Development for Plan Model of Tunnel construction by using Arena;on focused NATM
ARENA를 활용한 터널공사계획모델 개발에 관한 연구;NATM공법을 대상으로
- Published : 2007.11.09
Abstract
Estimation of total construction period and cost in the early stage of the project is very important. Simulation is one of the method considering proper compound such as tools, materials for effective construction management and estimating and analysing affected factors to construction through making suitable process. This study is to develop the model by using Arena simulation considering limited facts like blast time in a subway tunnel construction of both sides inner city. Developed model is easily useful type by using Visual Basic program, and can obtain total construction period and cost as a result. It could be used as a decision making tool in early stage of the construction.
건설공사의 공사 초기단게에서 총 공사기간과 공사비용의 예측은 매우 중요하다. 터널공사는 공기가 길고, 복잡한 공정이 반복적으로 이루어지는 건설공사의 일종이다. 시뮬레이션은 효과적인 건설공사 관리를 위하여 공사 장비 및 자재 등의 적절한 조합을 고려하고, 현장에 적합한 프로세스를 구성하여 실제 공사에 미칠 영향을 예측하고 분석할 수 있는 기법이다. 본 연구에서는 NATM공법으로 시공되는 양방향 도심지 지하철 터널공사에서 발파시간 등의 제한사항을 고려한 모델을 Arena 시뮬레이션을 이용하여 개발하였다. 개발된 모델은 비쥬얼베이직을 이용하여 쉽게 사용할 수 있는 형태로 개발되었으며, 결과값으로 총 공사기간과 공사비용을 얻을 수 있다. 이 결과를 이용하여 공사 초기 단계에서의 의사결정 도구로서 사용될 수 있을 것이다.