A Study on the Wind Load Design for Transmission Tower in Southeast Asia

동남아시아 송전철탑 풍하중 설계에 관한 연구

  • Published : 2007.07.18

Abstract

Korea, for the first time in the world, constructed 765 kV double circuits transmission lines, which has 3 phases and 6 bundles with vertical arrangement using steel pipes in 1998. Also in 2002, we developed 765kV outdoor full GIS substation with self-developed technology. KEPCO accumulated a wealth of technologies for 765kV system construction and operation, and are listed 5th in technology field in the world. With this advanced technologies, we are developing oversea business. We started with a projects, 'Development Study on the Power System Network Analysis in Myanmar' in 2001, and continued the project to transmission design, consulting for transmission technology including the education of foreign trainees in south-east and middle east asia. Currently, 12 overseas businesses including 330kV transmission system consulting in Ghana, are in progress. In 2007, beginning with 750 kV transmission consulting in China, we are operating ATT(Advanced Transmission Technology) training program, which educate engineers of government and utilities company from China, Myanmar, Cambodia, Laos and Cambodia. However, for the successful development study on the power system, design of the power system and the training service, it is essential to standardize load design criteria in consideration of temperature, wind speed, air pressure and density, etc. of the other countries. Therefore, in this paper, standardized load design criteria for Cambodia, Laos, Myanmar is explained.

Keywords