In this construction case study, Crushed stone under 100mm diameter was carried out a test compacted construction for subgrade in the 3rd. runway of the 2th Incheon International Airport Construction area. Conforming to specification needs a minimum rolling compacted number 10 for upper subgrade 100% compaction degree indicated in Federal Aviation Administration and $K_{30}{\geq}20kgf/cm^3$ in plate bearing test. $K_{30}$ to be acquired 100% compaction degree of upper subgrade is confirmed to about $31kgf/cm^3$ from correlation $K_{30}$ vs relative compaction degree.