Proceedings of the Korean Geotechical Society Conference (한국지반공학회:학술대회논문집)
- 2005.03a
- /
- Pages.507-514
- /
- 2005
A Test Compacted Construction for Subgrade in the 3rd Runway of the 2th Incheon International Airport Construction Area using Crushed Stone
인천국제공항2단계 제3활주로 부지에서 파쇄암을 이용한 노상 시험다짐 시공
- Kim, Jong-Kuk (Institutoin of Korea Construction Quality Test&Analysis) ;
- Son, Hyung-Ho (Dept. of Technical Management, Institutoin of Korea Construction Quality Test&Analysis) ;
- Kim, Young-Ung (Dept. of Site Preparation, IIAC.) ;
- Kim, Yong-Cheol (Dept. of Site Preparation, IIAC.) ;
- Kim, Dong-Chul (Res. & Analysis Office, IIAC.) ;
- Kim, Yeon-Jung (Dept. of Geotechnical Engineering, Yooshin Corp.)
- 김종국 (한국건설품질시험원) ;
- 손형호 (한국건설품질시험원 기술관리실) ;
- 김영웅 (인천국제공항공사 부지조성처) ;
- 김용철 (인천국제공항공사 부지조성처) ;
- 김동철 (인천국제공항공사 건설시험소) ;
- 김연정 (유신코퍼레이션 지반공학부)
- Published : 2005.03.25
Abstract
In this construction case study, Crushed stone under 100mm diameter was carried out a test compacted construction for subgrade in the 3rd. runway of the 2th Incheon International Airport Construction area. Conforming to specification needs a minimum rolling compacted number 10 for upper subgrade 100% compaction degree indicated in Federal Aviation Administration and
Keywords
- crushed stone under 100mm diameter;
- airfield subgrade compaction degree;
- vibrating roller compacted number$K_{30}$ and $H_{75}$ using ${\phi}75cm&30cm$ plate