International conference on construction engineering and project management (국제학술발표논문집)
- 2005.10a
- /
- Pages.902-907
- /
- 2005
- /
- 2508-9048(eISSN)
THE APPLICATION OF THEORY OF CONSTRAINT IN SCHEDULING
- Tsung-Chieh Tsai (Department of Construction Engineering, National Yunlin University of Science & Technology) ;
- Min-Lan Young (Department of Construction Engineering, National Yunlin University of Science & Technology)
- Published : 2005.10.16
Abstract
This study was undertaken to develop a comprehensive scheduling method which applied the core concept(DBR) of TOC to PERT, and to combine Monte Carlo Simulation to revise the uncertainties of activities then to eliminate project duration uncertainty. Most of the project duration overlooks the fact that in spite of minimizing the project duration, the uncertainty of constrained resources still puts the reliability of project duration in jeopardy. For the contractor, however, the most important thing is to comply the project scheduling with the planning to reduce the uncertainty of the project activities, operational interaction and project duration. In order to demonstrate that the model can be used in construction project, the scheduling of a steel-structure project was used as a case study to verify the validity of this model.