Disassembly Scheduling with Multiple Product Types and Parts Commonality

공통 부품을 포함한 복수 제품들에 대한 분해 일정계획

  • Kim, Hwa-Joong (Institute of Production and Robotics (STI-IPR-LICP) Swiss Federal Institute of Technology (EPFL)) ;
  • Lee, Dong-Ho (Department of Industrial Engineering Hanyang University) ;
  • Xirouchakis, Paul (Institute of Production and Robotics (STI-IPR-LICP) Swiss Federal Institute of Technology (EPFL))
  • Published : 2004.05.21

Abstract

This paper focuses on the problem of determining the quantity and timing of disassembling used products while satisfying the demand of their parts or components over a planning horizon. The case of multiple product types with parts commonality is considered for the objective of minimizing the sum of setup, disassembly operation, and inventory holding costs. A heuristic is suggested, in which an initial solution is obtained using a linear programming relaxation method, and then improved by perturbing the given solution using a dynamic programming approach and a look-ahead check while considering the trade-offs among different cost factors.

Keywords