Proceedings of the Korean Operations and Management Science Society Conference (한국경영과학회:학술대회논문집)
- 2004.05a
- /
- Pages.421-424
- /
- 2004
Disassembly Scheduling with Multiple Product Types and Parts Commonality
공통 부품을 포함한 복수 제품들에 대한 분해 일정계획
- Kim, Hwa-Joong (Institute of Production and Robotics (STI-IPR-LICP) Swiss Federal Institute of Technology (EPFL)) ;
- Lee, Dong-Ho (Department of Industrial Engineering Hanyang University) ;
- Xirouchakis, Paul (Institute of Production and Robotics (STI-IPR-LICP) Swiss Federal Institute of Technology (EPFL))
- Published : 2004.05.21
Abstract
This paper focuses on the problem of determining the quantity and timing of disassembling used products while satisfying the demand of their parts or components over a planning horizon. The case of multiple product types with parts commonality is considered for the objective of minimizing the sum of setup, disassembly operation, and inventory holding costs. A heuristic is suggested, in which an initial solution is obtained using a linear programming relaxation method, and then improved by perturbing the given solution using a dynamic programming approach and a look-ahead check while considering the trade-offs among different cost factors.
Keywords