Development of the Pre-Release Simulation System Using Generic Agricultural System Simulator(GASS)

범용적 농업 시스템 시뮬레이터(GASS)를 이용한 예비방류 모의 시스템의 개발

  • Published : 2003.10.31

Abstract

In South Korea, flooding is controlled with large or small reservoirs scattered spatially over the territory. Because recent unexpected hard-rain events requires more flood control capacities, the pre-release system is considered with the most economical alternative. In this case time and volume of discharge should be determined by the simulation. But, existing pre-release simulation system has the problem of specificity. Therefore, GASS is considered to estimate the pre-release time and volume with different configurations of pre-release system. This paper shows that pre-release simulation system could be constructed with arranging GASAtmosphere, GASWatershed, Reservoir, Gate components using GASS. It is also shows that GASS could be used as a foundation for constructing pre-release simulation system that is easy to use and is flexible to reflect the changing configurations of reservoir systems.

Keywords