Evaluating Performance Indices to forecast Estimate at Completion(EAC)

최종공사비 예측을 위한 성과지수 평가

  • 이동준 (서울대학교 건축학과 대학원) ;
  • 손보식 (서울대학교 건축학과 대학원) ;
  • 이현수 (서울대학교 건축학과)
  • Published : 2003.11.01

Abstract

Using EVMS can probably cause lots of confusion under the different systems and different circumstances of the construction industry between Korea and The United States, because The United States has wide experience in applying to EVMS during several decades but Korea has not. Therefore this research deals with the problem about Performance Indices in forecasting EAC(Estimate at Completion) among the problems of using EVMS. A target index of testing in this research is the Performance Indices used in the research at home and abroad in the past and those is applied to APT projects within the country with statistical method. Through this method, we can catch the tendency and the properties of the Performance Indices for applying to Korea.

우리와 미국의 건설사업 환경 및 제도가 다른 상황에서, EVMS의 도입은 적지 않은 혼란을 가져올 수 있다. 미국의 경우는 수십년간의 많은 경험을 바탕으로 EVMS를 적용하고 있으나, 국내는 이제 EVMS를 도입하고 활용하기 시작하는 단계이기 때문이다. 이에 본 연구에서는 EVMS 도입상의 문제점 중에서도 최종공사비 산정시 성과지수의 사용에 대한 문제를 다루어 보고자 한다. 본 연구에서는 국내${\cdot}$외의 연구에서 사용된 지수를 검증대상 지수로 보고. 이를 EVMS방식이 적용된 국내 아파트 프로젝트에 통계적으로 적용해 보았다. 이를 통하여, 국내 적용될 수 있는 지수들을 평가하고 지수들의 경향 및 특성을 파악할 수 있었다.

Keywords