Proceedings of the Korea Committee for Ocean Resources and Engineering Conference (한국해양공학회:학술대회논문집)
- 2002.10a
- /
- Pages.51-55
- /
- 2002
LOADOUT DEVELOPMENT BY F.E. ANALYSIS METHODOLOGY FOR SIMILAR 300K VLCC SIZE FSO
- Yang, Y.T. (Hyundai Heavy Industries Co. Ltd Offshore Division) ;
- Kang, H.S. (Hyundai Heavy Industries Co. Ltd. Offshore Division)
- Published : 2002.10.25
Abstract
End of July. 2002 Hyundai Heavy Industries Co. Ltd. Offshore Division is successfully completed Load-out & Float-off work of "AMENAM KPONO/FSO Project" similar to 300K VLCC size. The AMENAM FSO hull and topside module built at the HHI Offshore yard using "On-Ground Building Method" developed by HHI. Various methodologies/techniques like Flexi-built FPSO Hull. Topside module erection method. Load-out Float-off methodology etc. are combined to develop a successful on-ground building method. In this paper, we described the "Hull Structural Strength Analysis Methodology" using 3-D Finite Element Analysis and results. This analysis is performed to verily the structural integrity or the AMENAM FSO hull during the main load-out on two semi-submersible barges combined together.