Aging Effect Management for Class 1 Piping of PWR

가압경수로 원전 안전 1등급 배관의 노화영향 관리

  • Published : 2001.06.27

Abstract

A previous feasibility study for the Korean lead plant, PLiM Phase I, showed a strong possibility of continued operation beyond the original licensed period. In 1998, PLiM Phase II study was initiated aimed at performing additional detailed evaluations on a wider range of components. The objective of this paper is to present the Korean PLiM efforts for Class 1 piping which is identified as one of the critical components with regard to long-term operation. The key findings such as typical design features, degradation mechanisms, technical issues, draft results from the lifetime evaluation for Class 1 piping of the lead plant are briefly described.

Keywords