Proceedings of the KSME Conference (대한기계학회:학술대회논문집)
- 2000.04a
- /
- Pages.797-802
- /
- 2000
Scheduling of a Flow Shop with Setup Time
Setup 시간을 고려한 Flow Shop Scheduling
Abstract
Flow shop scheduling problem involves processing several jobs on common facilities where a setup time Is incurred whenever there is a switch of jobs. Practical aspect of scheduling focuses on finding a near-optimum solution within a feasible time rather than striving for a global optimum. In this paper, a hybrid meta-heuristic method called tabu-genetic algorithm(TGA) is suggested, which combines the genetic algorithm(GA) with tabu list. The experiment shows that the proposed TGA can reach the optimum solution with higher probability than GA or SA(Simulated Annealing) in less time than TS(Tabu Search). It also shows that consideration of setup time becomes more important as the ratio of setup time to processing time increases.
Keywords
- Flow Shop;
- Scheduling;
- Setup time;
- Meta-heuristic;
- Genetic Algorithm;
- Simulated Annealing;
- Tabu Search;
- Tabu-Genetic Algorithm
- 흐름 생산;
- 일정계획;
- 준비시간;
- 메타 휴리스틱;
- 유전 알고리듬;
- 시뮬레이티드 어닐링;
- 금기 탐색;
- 금기-유전자 알고리듬;