Instrumented Field Performance of an Isolated-Reinforced Earth Wall

분리형 보강토옹벽의 현장계측 및 분석

  • 김영윤 (보강기술(주) 기술연구소) ;
  • 한경제 (보강기술(주) 기술연구소) ;
  • 김경모 (보강기술(주) 기술연구소)
  • Published : 2000.11.01

Abstract

As the reinforced earth wall is constructed with step by step backfill compaction method, the accumulative horizontal deformation is inevitable. It has been reported that about 80% of horizontal deformation is occurred during the construction stage of reinforced earth retaining wall. To reduce the horizontal deformation, an isolated-reinforced earth wall method(KOESWall system) was newly developed. In this system, the reinforced earth is constructed first with reinforcements and backfills only, and then facing blocks are installed after the horizontal displacement of reinforced earth is fully occurred. To evaluate the effect of a construction method and the performance of KOESWall system, two cases of full scale field performance was monitored during and after the construction stages.

Keywords