컨베이어 벨트를 이용한 혼합 모델 조립 라인에서의 미완료 작업량을 최소화하기 위한 제품 투입 순서 결정

  • 김시원 (연세대학교 산업시스템공학과) ;
  • 정봉주 (연세대학교 산업시스템공학과)
  • Published : 2000.10.01

Abstract

This study is concerned with how to optimize the Input sequence of product models with sequence -dependent setup time in Mixed-Model Assembly Line (MMAL) using conveyor system. Usually MMAL consists of a number of stations linked by conveyor belt and each station has a work zone limited by upstream and downstream boundaries. To avoid improper interference between operators in the adjacent stations and excess of machine moving range, operators are forced to complete their operations within their predetermined work zone. In this study, our goal is to determine sequence of models for minimizing the total work unfinished within their work zone. A generalized formulation of the product sequencing problem in MMAL is presented and we developed an optimal procedure using Branch & Bound. Also we developed a heuristic procedure using local search.

Keywords