Design, Implementation of the Bulk Power Stabilizing System to ensure the appropriate Power System Reliability

적정 공급신뢰도 확보를 위한 안정화장치 구성 및 설치운영

  • 김창무 (한국전력공사 계통운용처) ;
  • 이효상 (한국전력공사 계통운용처) ;
  • 이승언 (한국전력공사 계통운용처) ;
  • 김석일 (한국전력공사 계통운용처)
  • Published : 1999.07.19

Abstract

Carried out simulation for yearly peak and March load time of the KEPCO Power System in 1999. Analysis of the problems in power system operation by powerflow, fault and stability study. Establishment of power system optimal operating plan by installation of power system stabilizer.

Keywords