Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 1997.07c
- /
- Pages.1060-1063
- /
- 1997
Generation Planning Algorithm Considering Environmental Constraints Near Thermal Power Plants
화력발전소 주변환경제약을 고려한 발전계획 알고리즘에 관한 연구
- Lee, B. (Yusu National Fisheries University) ;
- Kim, Y.H. (Inchon University) ;
- Cha, J.M. (Dajin University) ;
- Roh, K.M. (Chungchung junior college) ;
- Oh, K.H. (Railroad Research Institute) ;
- NamKung, J.Y. (Korea University) ;
- Song, K.Y. (Korea University)
- 이범 (여수수산대 전기과) ;
- 김용하 (인천대 전기과) ;
- 차준민 (대진대 전기과) ;
- 노규민 (충청전문대전기과) ;
- 오광해 (철도연구원) ;
- 남궁재용 (고려대전기과) ;
- 송길영 (고려대전기과)
- Published : 1997.07.21
Abstract
A new generation planning algorithm considering environmental constraint by using fuzzy technique is developed. This algorithm has a new formula which can consider environmental constraints and an effective solving method which has newly developed fuzzy dual procedure. By using this algorithm, economic generation planning considering environmental constraints can be scheduled. The usefulness of this method is verified by applying it to the test system.
Keywords