대한전기학회:학술대회논문집 (Proceedings of the KIEE Conference)
- 대한전기학회 1997년도 하계학술대회 논문집 D
- /
- Pages.751-753
- /
- 1997
배전자동화 시스템 실계통 실증시험 결과 및 개선방안
The result and improvement of the field test in Distribution Automation System
- Cho, Nam-Hun (Korea Electric Power Research Institute) ;
- Ha, Bok-Nam (Korea Electric Power Research Institute) ;
- Park, Sang-Man (Korea Electric Power Research Institute)
- 발행 : 1997.07.21
초록
The field test system covers three substation, 25 distribution feeders and 125 automated switches. Many small electric vendors participated in this project. Although each device is a small prototype, it was designed to carry out all of the functions. In performing the project, KEPRI has gained valuable experience, through dealing with many difficult problem. This paper is depicted about many kind of those difficult problems.
키워드