여천 임해공업단지 매립 계획 및 설계
Reclamation Plan and Design for The Yeochon Industrial Complex
초록
The elevation of reclamation work in the coastal area for the industrial complex is determined through the investigation and review of marine conditions, drainage plan and fill materials. The embankment to be constructed with crushed stone on the soft soil should be safe against the wave force, immediate and long term consolidation settlement, overturning and sliding due to self-weight and other forces. Because of lack of fill material from the borrow pit, the soft marine clay to be dredged shall be used as the reclamation material. And Paper Drain Board is used as the improvement method for the deep soft clay strata.