• 제목/요약/키워드: work process analysis

검색결과 2,831건 처리시간 0.036초

테스트워크의 스트립 레이아웃설계에 관한 연구 (A study on the design of layout for test work)

  • 김세환;최계광
    • Design & Manufacturing
    • /
    • 제6권1호
    • /
    • pp.34-38
    • /
    • 2012
  • Test work is the press die branch at The Korea-China-Japan Grand Prize Contest. This study focuses on strip layout design for test work. A comparison is drawn between product shape and blank deployment line. During the forming analysis of the whole product, shape part of the total forming process is analyzed. As for forming part and flange deployment, forming analysis is carried out in part during the mid process. Material utilization is 42.6 percent and strip layout design is completed in 14 processes that are comprised of hourglass, slotting, embossing, drawing and trimming.

  • PDF

석면 해체제거 보양작업에서 JSA 및 Checklist 적용 (Application of JSA and Checklist in Asbestos Sealing)

  • 조규선
    • 한국안전학회지
    • /
    • 제35권2호
    • /
    • pp.61-66
    • /
    • 2020
  • As asbestos-containing buildings are getting older, asbestos deconstruction works are increasing. As a result, accident risks such as falls, cuts, electric shocks, and suffocation are increasing. Existing studies are mostly about health management and institutional policy research and there is little research on work risk. So workplace risk assessments that are easily applicable in the field are required to be applied. Sealing is the first process of asbestos deconstruction and is the first step to ensure worker's safety. Job Safety Analysis(JSA) and Checklist were used to identify the risk factors and to calculate the level of the risk. By comparing the two risk assessment tools, it was figured out that the JSA is appropriate for the initial process and change of work procedure while Checklist is appropriate for repetitive work. Because the sealing process is sort and simple, it is unlikely to cause serious injury. But since the risk of falling and cuts are exist, safety education and supervision are necessary to maintain a safe working environment.

공동주택의 PC계단실 조립 프로세스 분석 (Erection Process Analysis of the PC Staircase in the Apartment Building )

  • 김기호;이범식;이동건;김민준;손정락
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.103-104
    • /
    • 2023
  • The purpose of this study is to specify an erection process for each member of the PC staircase. For this purpose, field work was investigated at the LH PC apartment building site and classified in detail through unit work analysis inspection. The results of this study are intended to be used as basic data for creating work sequences and related guidelines for LH's PC staircase.

  • PDF

PDS를 활용한 여성용 테일러드 재킷패턴제작의 작업효율성 (A Study on the Work Efficiency of Pattern Making of Woman's Tailored Jacket by PDS)

  • 도월희
    • 한국생활과학회지
    • /
    • 제16권1호
    • /
    • pp.137-143
    • /
    • 2007
  • The purpose of this study is to prove the work efficiency of PDS by measuring the work time on the process of pattern making of woman's tailored jacket. Also compared to the manual work time, PDS work efficiency is estimated according to experience difference. The YUKA CAD system was used. Through analysis of PDS Process, work time was measured by stop watch. Also the appearance of the 2 jackets was evaluated by a pool of evaluators consisted of graduate students and experienced professional modelist. The results were as follows: The work efficiency of PDS is higher than the work efficiency of manual work. There were significant differences of work time between work types in the expert and inexpert group. A study compared the work efficiency by PDS work type with those by manual work type according to experience difference and found that the work efficiency by PDS in the expert group was 25.3%, in the inexpert group was 35%. There were significant differences of work time between experience groups in PDS work, the work efficiency of expert group to inexpert group in the total pattern making time by PDS was 36.7%. There were no significant differences of appearance of tailored jacket between work types.

A Study on Structural Model of Work-Values, Job Satisfaction and Task Performance of Generation Y Staff in the Hotel Industry

  • Choi, Hyunjung
    • 한국조리학회지
    • /
    • 제23권6호
    • /
    • pp.78-88
    • /
    • 2017
  • The main goal of this study was to demonstrate the causal relationships between multi-dimensional work-values, job satisfaction and task performance of Y generational employee in the Korean hotel industry. In order to achieve the purpose, the data were collected from Y generational employees working in the major cities in Korea. To analyze the data, frequency, exploratory factor analysis, reliability analysis, PROCESS Macro analysis and simple regression analysis were undertaken by using SPSS 18.0. The results were as follows; 1. Work-values were found out as five factors; Prestige workvalues, Personal development work-values, Work condition work-values, Personal welfare work-values, Social/ Altruistic work-values. 2. All five factors were found to be significant in enhancing job satisfaction. 3. Two factors which were prestige work-values and personal welfare work-values were found to be significant in facilitating task performance. 4. Job satisfaction was revealed as a mediator between all work-value factors and task performance. This study provided practical information about work-values of Y generational hoteliers to positively affect their job satisfaction and task performance. This study also confirmed that it is important to enhance job satisfaction in order to make employees perform their service duties better.

열간 단조 작업의 무인화를 위한 자동화시스템 개발 (Development on unmanned automated system at hot Forging work)

  • 정성호;이준호
    • 한국기계가공학회지
    • /
    • 제12권5호
    • /
    • pp.163-169
    • /
    • 2013
  • The objective of this study is to replace labor intensive forging processes by an automated system. For achieving it, an exclusive mechanism that consists of a positioner, an arm, and a hanger is configured to handle hot forging objects. Also, a structural analysis is applied to the horizontal motion unit, which is the most highly loaded, in order to verify its validity. In addition, its possibility is also verified through identifying the performance of the proposed system before applying it to sites. As a result, the major characteristic items, such as positioning accuracy, material diameter, object traveling weight, product failure rate, and forging process rate, in this system are perfectly verified for applying it to manufacturing sites.

작업일보 데이터 분석 기반 공정 진척 패턴 분석 (Process Progress Pattern Analysis based on Daily Work Report Analysis)

  • 고용호;신영근;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.156-157
    • /
    • 2016
  • Construction projects have shown a dramatic increase in size and complexity during the recent years that precise management has been recognized as one of key factors leading the project to success. It has been investigated that management in construction sites is generally done based on the experience of site engineers. Such experience based decision making lacks reliability that could bring disastrous results such as delay and cost overruns. The purpose of this study is to suggest a process progress pattern analysis method that is expected to be used as an objective reference for site managers to aid the decision making done regarding process progress management.

  • PDF

강교량 제작 프로세스 모델을 기반으로한 WBS구축 (Work Breakdown Structure(WBS) based on the Steel Box Girder Production Process Model)

  • 하승호;김석;김경민;박찬혁;김경주
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.521-525
    • /
    • 2004
  • 본 연구의 목적은 강교량 제작 현장에서의 효율적인 정보관리를 지원하기 위한 정보관리체계의 구축을 목적으로 한다. 이를 위해 강교량 제작 업무 프로세스와 제작공종별 발생정보의 흐름과 정보관리 레벨(Level)을 분석함으로써 업무 수행과정에서의 효율적인 정보관리를 지원하기 위한 WBS 구축방안에 대한 연구를 수행하였다. 강교량 제작은 다양한 제작공정을 거쳐 수행되며, 각 단계별 업무 목적 및 관행에 따라 다양한 정보관리 수준을 갖는 것으로 파악되었으며, 효율적인 공정, 원가, 자원 및 풀질 등의 정보 관리, 공유 및 재활용을 위해서는 공종과 강교 거더의 부위 분류체계를 바탕으로 한 WBS의 구축이 바람직한 것으로 분석되었다.

  • PDF

계층분석과정(AHP)을 활용한 권역단위 종합정비사업 사무장 의식의 상대적 중요도 평가 (A Relative Importance Evaluation for the Perception of Managers on the Comprehensive Rural Village Development Project using Analytic Hierarchy Process)

  • 장동헌
    • 농촌계획
    • /
    • 제21권1호
    • /
    • pp.41-50
    • /
    • 2015
  • In this study, the relative importance for the perception of managers on the comprehensive rural village development projects was evaluated using the AHP method. The fields for evaluation were 4 fields including human relationships, working conditions, work compensation and work burnout. Also, the relative importance for the perception of managers and priority order were analyzed through 15 evaluation items. The analysis result shows that the human relationships among 4 fields were regarded as the most important field, followed by work compensation, working conditions and work burnout. Also, the relationship with the chairperson for the human relationships, continuity of employment for the working conditions, salary for work compensation, and mental stress for work burnout were considered respectively as the most important item. Also, salary among all evaluation items was considered as the most important item for the relative importance, followed by continuity of employment, relationship with village residents and mental stress. However, work load, consulting firms, impersonal treatment and the relations between the administration showed relatively low importance and priority order. It is considered that this analysis result will be used as important preliminary data for establishing the role of manager in the comprehensive rural village development project.

세장비(細長比)가 큰 가공 소재를 포함한 소형 고속 스핀들 시스템의 고유진동 특성 연구 (A study on natural vibration characteristics of small and high speed spindle system with a long work piece)

  • 이재훈;김무수;박성훈;이시복
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2008년도 추계학술대회논문집
    • /
    • pp.184-185
    • /
    • 2008
  • Modal analysis is an important and essential process in design of a high speed machining center. Generally, modal analysis of a built-in spindle system has not taken the work piece's shape and dimension into consideration. Since small and long work pieces influence greatly the natural frequency of the entire system, the high speed spindle system which continuously makes small machine parts by long work pieces for improvement of machining time has to consider the machining work pieces. Therefore frequency characteristics of the spindle system with long work pieces are studied in this paper.

  • PDF