Nowadays, dependency upon the construction equipment is getting bigger and the mass of equipment cost is increase, those are indirect evidence of important of equipment. But construction field has the characteristic that is the various activities and wide work area. These make many problems in the operating of equipments. These problems bring about diminution of workability and productivity, in result it makes increase of cost and time. Owing to solve the problems, this study introduce of Telematics technique. This study analyzes process into its work and management for construction equipment using at the land work, and will apply Telematics to the field equipments.
Computers and internet have the potential to radically development. But, computer is a just tool by itself. This study is control implement in a way that exploits the capacity of network of processors to execute many tasks concurrently in architectural desigv. The collaboration design system constituted integrated CAD (computer-aided design) system at the base of standardization database environment network and world wide web (WWW). Collaboration design management system is composed of Project Management, Part Management, Process Management , and Appraisement system. They can provide frameworks for effective coordination and management of design work in accordance with the Collaboration Design Support System operating rule accommodatingly. architectural data can be collaboration design environment accessible through a web browser and located at a server. whenever their work investigated each others. Throughout process, the database acted as an individual design and it made them available in realtime. And they can have quick overview of the work. That way a continuous evaluation of best design was distinctly and highly. In the future, New architectural design methods are collaboration environment could result in productivity and quality.
Kim, Ki-Hong;Shin, Seung-Jun;An, Kyui-In;Nam, Seung-Don;Kang, Kyung-Sik
Journal of the Korea Safety Management & Science
/
v.13
no.4
/
pp.25-33
/
2011
Workers in logistics centers also are exposed to serious musculoskeletal disorders the same as workers in general manufacturing due to operating forklifts and other labor duties. The frequency of these work related injuries decreases, workers' job satisfaction In addition, it causes many employees questioning a job change, which is regarded as the primary factor which drops the productivity. In this paper, we conducted a survey ti perceive the correlation between work related injuries in the fields of distribution centers and job satisfaction. Furthermore we made statistical analysis with our findings. The results of our analysis showed that the frequency of work related injuries due to workers' repetitive loading and unloading work is the primary factor which lowers job satisfaction. In order to improve aforementioned problem we propose first of all loading and unloading on pallet basis, second of all automation and computerization of logistics systems, and third of all ensurinf sufficient break time.
To develop the port productivity and effictiveness, the introduction of the On Dock Operating System in Pusan Container Terminals has to be considered and the present Off Dock CY be closed step by step. This work aims to evaluate the needed CY area in Pusan Port under the On Dock Operating System. This researching flow is as follows. Firstly, estimate total sea-borne container cargo volumes in Korea and distribute them to all container terminals according to the past trends and the planned port development. Secondly, estimate the average period and the average tiers stored at On Dock CY in case of On Dock Operating System. Thirdly caculate the needed CY Area to handle the distributed container cargo volume under the On Dock Operating System. Finally, the following results are obtained. (1) In 1998, opening the Gamman Terminal, 827 thousands cubic meters are insufficient. (2) In $2001\sim2004$, the insufficiency of needed CY Area will be maximized and estimated to be 936 thousands cubic meters in 2001. (3) In $2005\sim2011$, opening the Gadu Terminal, the insufficiency of needed CY Area will be decreased and estimated to be 240 thousands cubic meters in 2011.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2007.12a
/
pp.335-336
/
2007
This paper propose a heuristic method that divides the block into some work regions to operate stacking cranes efficiently in a automated container terminal where the blocks with non-crossing stacking cranes(SC) are laid out in perpendicular to the quay. Typically, fund over between SCS and trucks occur at each side if the blocks, and each if the landside and seaside SCS is responsible for the jobs that occur at its own side. When a container to be fetched is located far from fund over point, the SC should move a long distance and the interference between the two cranes am occur, which decreases the productivity of the SCS. Therefore, our method divides the block into two exclusive and one shared regions and let the containers located far from their fund over points to be transferred to the shared region by the other side crane before they are carried out. Although simple this method am reduce the crane movement and the interference between the two cranes. Simulation experiment shows that our proposed method significantly improves the productivity if the container terminal than previous heuristic that does not divide work regions.
Journal of Korean Institute of Industrial Engineers
/
v.41
no.3
/
pp.275-286
/
2015
In this paper, we propose a practical method for setting up a daily production plan which can operate semiconductor fabrication factories more stably and linearly by determining work in process (WIP) targets and movement targets. We first adjust cycle times of the operations to satisfy the monthly production plan. Second, work in process (WIP) targets are determined to control the production progress of operations: earliness and tardiness. Third, movement targets are determined to reduce cumulated differences between WIP targets and actual WIPs. Finally, the determined movement targets are modified through a simulation model which considers capacities of the equipments and allocations of the WIPs in the fab. The proposed daily production planning method can be easily adapted to the memory semiconductor fabs because the method is very simple and has straightforward logics. Although the proposed method is simple and straightforward, the power of the method is very strong. Results from the shop floor in past few periods showed that the proposed methodology gives a good performance with respect to the productivity, workload balance, and machine utilization. We can expect that the proposed daily production planning method will be used as a useful tool for operating semiconductor fabrication factories more efficiently and effectively.
The resource-based estimating based on standard unit price of construction work was estimated by multiplying the price per standard unit of work on the amount of labor, material, equipment use time. However, limitation of the resource-based estimating way does not adequately reflect the actual transactions prices. On the subject of water tunnel excavation as a new attempt to overcome these limitations, this study analyzed productivity by work type into cutter inspection/ exchange, TBM maintenance, TBM inspection/refueling, subsequent installations, tramcar, operating change, a cave-underground reinforcement / rock reinforcement, safety / meetings and analyzed actual cost estimating and the net advance rate based on this analysis result. Actual cost estimating calculation approach presented in this study can be utilized as a useful tool to predict the actual cost estimating in the TBM water tunnels field.
In order to become a mega hub port, major ports all over the world are making every effort to enhance their productivity through efficiency of internal operation. Accordingly, in order to enhance the competitiveness of a container terminal, an automated container terminal is considered as the best alternative. An automated container terminal is using such automated handling equipment as AGV(Automated Guided Vehicles) and ATC(Automated Transfer Crane). The efficient equipment operation plays a critical role in enhancing the productivity of an automated container terminal. In an automated container terminal, the most important equipments are AGV and ATC. Each block of containers with a vertical layout is generally operating two ATCs. The two ATCs can be crossed or not at each block. In the case of operating crossover ATC, it has an advantage of high flexibility that ATC work is possible at both TP(Transfer Point) of each block. But it has also a disadvantage that the yard has to be operated at a low storage level of containers in the terminal yard. Recently, for automated container terminals, which are being prepared for opening in Korea, they plan to use uncrossed twin ATC in order to make the storage level of their yards high at a low cost. Therefore, studies have to be made in order to increase the efficiency of twin ATC system based on the flexibility that the crossover ATC system has. This research aims to suggest an operation strategy to improve efficiency of twin ATC at each storage block in a yard.
Journal of the Korea Society of Computer and Information
/
v.6
no.1
/
pp.95-102
/
2001
Supply Chain Management drawing attention of business management all over the world. This study has simulated OPT(Optimized Production Technology) to verify the Supply Chain Management's effectiveness The OPT system develops a detailed operating Philosophy, not just an operating procedure, and it includes many of the features of the JIT system and additional benefits as well The important OPT concepts such as. transfer batch. manufacturing process batch and batch it self served as a Pivotal role in increasing the productivity in manufacturing when they were altered. In this respect, this study develop the OPT simulation model, and this OPT model are evaluated by using a simulation study. It has proved that the performances of OPT model are excellent.
Kim, Jin-Il;Jeong, Jin-Beom;Kim, Hee-Jun;Kim, Sun-Hwan;Oh, Pil-Kyoung
Proceedings of the KIEE Conference
/
2002.11d
/
pp.187-190
/
2002
Plasma Display Panel(PDP) has been recognized as one of the most competitive display panel. Hence, the importance of PDP driving circuit is getting higher and higher. At the same time, it is strongly required for the driving circuit to be high efficiency, high stability, and cost effective one. In this work, a stable PDP driving circuit is developed by improving the circuit configuration. And the reliability and the productivity of the driving circuit are improved by using the Intelligent Power Module(IPM) technology. Finally operating characteristics of the developed IPM driving circuit are verified by using signal source board developed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.