• Title/Summary/Keyword: work operating productivity

Search Result 44, Processing Time 0.029 seconds

Analysis of Validity for Implementation of Telematics and Suggestion of Feasibility Analysis in Construction Fields (Telematics 기술의 건설현장 적용을 위한 타당성 분석 및 경제성 분석을 위한 요인 도출)

  • Lee, Tai-Sik;Lee, Dong-Wook;Koo, Ja-Kyung
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.947-952
    • /
    • 2005
  • Nowadays, dependency upon the construction equipment is getting bigger and the mass of equipment cost is increase, those are indirect evidence of important of equipment. But construction field has the characteristic that is the various activities and wide work area. These make many problems in the operating of equipments. These problems bring about diminution of workability and productivity, in result it makes increase of cost and time. Owing to solve the problems, this study introduce of Telematics technique. This study analyzes process into its work and management for construction equipment using at the land work, and will apply Telematics to the field equipments.

  • PDF

A Study on the Collaboration Design System Operation and Component Using the Network in Architectural Design (건축계획에서 네트워크 구축을 통한 공동설계의 운영과 구성에 관한 연구)

  • 조성오
    • Korean Institute of Interior Design Journal
    • /
    • no.18
    • /
    • pp.9-15
    • /
    • 1999
  • Computers and internet have the potential to radically development. But, computer is a just tool by itself. This study is control implement in a way that exploits the capacity of network of processors to execute many tasks concurrently in architectural desigv. The collaboration design system constituted integrated CAD (computer-aided design) system at the base of standardization database environment network and world wide web (WWW). Collaboration design management system is composed of Project Management, Part Management, Process Management , and Appraisement system. They can provide frameworks for effective coordination and management of design work in accordance with the Collaboration Design Support System operating rule accommodatingly. architectural data can be collaboration design environment accessible through a web browser and located at a server. whenever their work investigated each others. Throughout process, the database acted as an individual design and it made them available in realtime. And they can have quick overview of the work. That way a continuous evaluation of best design was distinctly and highly. In the future, New architectural design methods are collaboration environment could result in productivity and quality.

  • PDF

Survey of the correlation between work injuries and job satisfaction in Logistics Center and ways to improve work satisfaction (물류센터 작업질환과 직무만족간 상관성 조사 및 개선방안)

  • Kim, Ki-Hong;Shin, Seung-Jun;An, Kyui-In;Nam, Seung-Don;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.4
    • /
    • pp.25-33
    • /
    • 2011
  • Workers in logistics centers also are exposed to serious musculoskeletal disorders the same as workers in general manufacturing due to operating forklifts and other labor duties. The frequency of these work related injuries decreases, workers' job satisfaction In addition, it causes many employees questioning a job change, which is regarded as the primary factor which drops the productivity. In this paper, we conducted a survey ti perceive the correlation between work related injuries in the fields of distribution centers and job satisfaction. Furthermore we made statistical analysis with our findings. The results of our analysis showed that the frequency of work related injuries due to workers' repetitive loading and unloading work is the primary factor which lowers job satisfaction. In order to improve aforementioned problem we propose first of all loading and unloading on pallet basis, second of all automation and computerization of logistics systems, and third of all ensurinf sufficient break time.

Evaluation of the needed CY Area in Pusan Port under the On Dock Operation System (부산항의 On Dock 운영화에 따른 소요 CY 면적 산정에 대하여)

  • Yeo, G.T.;Koo, J.Y.
    • Journal of Korean Port Research
    • /
    • v.11 no.2
    • /
    • pp.157-172
    • /
    • 1997
  • To develop the port productivity and effictiveness, the introduction of the On Dock Operating System in Pusan Container Terminals has to be considered and the present Off Dock CY be closed step by step. This work aims to evaluate the needed CY area in Pusan Port under the On Dock Operating System. This researching flow is as follows. Firstly, estimate total sea-borne container cargo volumes in Korea and distribute them to all container terminals according to the past trends and the planned port development. Secondly, estimate the average period and the average tiers stored at On Dock CY in case of On Dock Operating System. Thirdly caculate the needed CY Area to handle the distributed container cargo volume under the On Dock Operating System. Finally, the following results are obtained. (1) In 1998, opening the Gamman Terminal, 827 thousands cubic meters are insufficient. (2) In $2001\sim2004$, the insufficiency of needed CY Area will be maximized and estimated to be 936 thousands cubic meters in 2001. (3) In $2005\sim2011$, opening the Gadu Terminal, the insufficiency of needed CY Area will be decreased and estimated to be 240 thousands cubic meters in 2011.

  • PDF

Division of Work Regions for Operating the Yard in a Container Terminal (작업 영역 구분을 이용한 컨테이너 터미널의 장치장 운영 전략)

  • Ahn, Eun-Yeong;Park, Tae-Jin;Ryu, Kwang-Ryel
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2007.12a
    • /
    • pp.335-336
    • /
    • 2007
  • This paper propose a heuristic method that divides the block into some work regions to operate stacking cranes efficiently in a automated container terminal where the blocks with non-crossing stacking cranes(SC) are laid out in perpendicular to the quay. Typically, fund over between SCS and trucks occur at each side if the blocks, and each if the landside and seaside SCS is responsible for the jobs that occur at its own side. When a container to be fetched is located far from fund over point, the SC should move a long distance and the interference between the two cranes am occur, which decreases the productivity of the SCS. Therefore, our method divides the block into two exclusive and one shared regions and let the containers located far from their fund over points to be transferred to the shared region by the other side crane before they are carried out. Although simple this method am reduce the crane movement and the interference between the two cranes. Simulation experiment shows that our proposed method significantly improves the productivity if the container terminal than previous heuristic that does not divide work regions.

  • PDF

A Daily Production Planning Method for Improving the Production Linearity of Semiconductor Fabs (반도체 Fab의 생산선형성 향상을 위한 일간생산계획 방법론)

  • Jeong, Keun-Chae;Park, Moon-Won
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.41 no.3
    • /
    • pp.275-286
    • /
    • 2015
  • In this paper, we propose a practical method for setting up a daily production plan which can operate semiconductor fabrication factories more stably and linearly by determining work in process (WIP) targets and movement targets. We first adjust cycle times of the operations to satisfy the monthly production plan. Second, work in process (WIP) targets are determined to control the production progress of operations: earliness and tardiness. Third, movement targets are determined to reduce cumulated differences between WIP targets and actual WIPs. Finally, the determined movement targets are modified through a simulation model which considers capacities of the equipments and allocations of the WIPs in the fab. The proposed daily production planning method can be easily adapted to the memory semiconductor fabs because the method is very simple and has straightforward logics. Although the proposed method is simple and straightforward, the power of the method is very strong. Results from the shop floor in past few periods showed that the proposed methodology gives a good performance with respect to the productivity, workload balance, and machine utilization. We can expect that the proposed daily production planning method will be used as a useful tool for operating semiconductor fabrication factories more efficiently and effectively.

Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site - Diameter 5.0m Target (수로터널공사의 효율성 분석을 통한 굴진속도 및 직접공사비 분석 - 구경 5.0m 중심으로)

  • Park, Hong Tae;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.328-335
    • /
    • 2012
  • The resource-based estimating based on standard unit price of construction work was estimated by multiplying the price per standard unit of work on the amount of labor, material, equipment use time. However, limitation of the resource-based estimating way does not adequately reflect the actual transactions prices. On the subject of water tunnel excavation as a new attempt to overcome these limitations, this study analyzed productivity by work type into cutter inspection/ exchange, TBM maintenance, TBM inspection/refueling, subsequent installations, tramcar, operating change, a cave-underground reinforcement / rock reinforcement, safety / meetings and analyzed actual cost estimating and the net advance rate based on this analysis result. Actual cost estimating calculation approach presented in this study can be utilized as a useful tool to predict the actual cost estimating in the TBM water tunnels field.

Development of Operation Strategy to improve Efficiency for Twin Automated Transfer Crane in an Automated Container Terminal

  • Park, Byung-Joo;Choi, Hyung-Rim
    • Journal of Navigation and Port Research
    • /
    • v.31 no.7
    • /
    • pp.605-611
    • /
    • 2007
  • In order to become a mega hub port, major ports all over the world are making every effort to enhance their productivity through efficiency of internal operation. Accordingly, in order to enhance the competitiveness of a container terminal, an automated container terminal is considered as the best alternative. An automated container terminal is using such automated handling equipment as AGV(Automated Guided Vehicles) and ATC(Automated Transfer Crane). The efficient equipment operation plays a critical role in enhancing the productivity of an automated container terminal. In an automated container terminal, the most important equipments are AGV and ATC. Each block of containers with a vertical layout is generally operating two ATCs. The two ATCs can be crossed or not at each block. In the case of operating crossover ATC, it has an advantage of high flexibility that ATC work is possible at both TP(Transfer Point) of each block. But it has also a disadvantage that the yard has to be operated at a low storage level of containers in the terminal yard. Recently, for automated container terminals, which are being prepared for opening in Korea, they plan to use uncrossed twin ATC in order to make the storage level of their yards high at a low cost. Therefore, studies have to be made in order to increase the efficiency of twin ATC system based on the flexibility that the crossover ATC system has. This research aims to suggest an operation strategy to improve efficiency of twin ATC at each storage block in a yard.

Simulation of Optimized Production Technology System to verify the Supply Chain Management's Effectiveness (공급사슬경영의 유효성 입증을 위한 최적화생산시스템의 시뮬레이션)

  • 김종상
    • Journal of the Korea Society of Computer and Information
    • /
    • v.6 no.1
    • /
    • pp.95-102
    • /
    • 2001
  • Supply Chain Management drawing attention of business management all over the world. This study has simulated OPT(Optimized Production Technology) to verify the Supply Chain Management's effectiveness The OPT system develops a detailed operating Philosophy, not just an operating procedure, and it includes many of the features of the JIT system and additional benefits as well The important OPT concepts such as. transfer batch. manufacturing process batch and batch it self served as a Pivotal role in increasing the productivity in manufacturing when they were altered. In this respect, this study develop the OPT simulation model, and this OPT model are evaluated by using a simulation study. It has proved that the performances of OPT model are excellent.

  • PDF

A Study on The Development of IPM for PDP Drive (PDP 구동용 IPM 개발에 관한 연구)

  • Kim, Jin-Il;Jeong, Jin-Beom;Kim, Hee-Jun;Kim, Sun-Hwan;Oh, Pil-Kyoung
    • Proceedings of the KIEE Conference
    • /
    • 2002.11d
    • /
    • pp.187-190
    • /
    • 2002
  • Plasma Display Panel(PDP) has been recognized as one of the most competitive display panel. Hence, the importance of PDP driving circuit is getting higher and higher. At the same time, it is strongly required for the driving circuit to be high efficiency, high stability, and cost effective one. In this work, a stable PDP driving circuit is developed by improving the circuit configuration. And the reliability and the productivity of the driving circuit are improved by using the Intelligent Power Module(IPM) technology. Finally operating characteristics of the developed IPM driving circuit are verified by using signal source board developed.

  • PDF