• Title/Summary/Keyword: wind power generation

검색결과 912건 처리시간 0.131초

제주행원 풍력발전단지의 전압품질 및 연계기준 적합성 분석 (Voltage quality and Network Interconnection Standard Suitability in Jeju-Hangwon Wind Power Generation Farm)

  • 김세호;김일환;허종철
    • 한국태양에너지학회 논문집
    • /
    • 제26권2호
    • /
    • pp.53-59
    • /
    • 2006
  • The number of wind generation installations are growing substantially in Jeju, Korea. Many of these installations are significant in size and directly connected to the distribution system. Utility grid interconnection standards for interconnecting non-utility distributed generation systems are essential to both power system company and generation company. These interconnection standards are important to utilities, customers, wind generation manufactures and nation. In this paper, it is investigated the voltage quality and the suitability of Jeju-Hangwon wind power generation farm by network interconnection technology standard.

동해 부유식 해상풍력발전단지 내 참다랑어 양식장 조성에 관한 연구 (A Study on the Building of Tuna Farming in Floating Offshore Wind Power Generation Field at East Sea)

  • 최군환;김미정;장기호;김효선
    • 한국해안·해양공학회논문집
    • /
    • 제33권5호
    • /
    • pp.179-186
    • /
    • 2021
  • 재생에너지 3020 이행계획, 한국판 뉴딜 계획 등에 따라 신재생에너지 생산 비중 증가 대응과 해상풍력발전 12GW 건설을 위해 어업생활권 점유 대안 마련과 주민 수용성 제고를 위한 방안이 요구된다. 본 연구는 동해에 적합한 해상풍력발전단지와 연계한 수산자원 공존모델의 차별방안을 제시하였다. 동해는 부유식 해상풍력 발전단지 조성의 최적지로 단지 내 공유수면을 활용하여 외해양식에 적합한 고부가가치 어종인 참다랑어를 양식함으로써 에너지 생산, 수산자원 개발, 관광산업화를 통한 이익 창출로 경제적 효과 발생을 예측하였다. 또한, 운영관리 기술 공유 등으로 예산 감축, 스마트 관리 추진과 어민소득 증대 가능성을 확인하였다.

딥러닝을 이용한 풍력 발전량 예측 (Prediction of Wind Power Generation using Deep Learnning)

  • 최정곤;최효상
    • 한국전자통신학회논문지
    • /
    • 제16권2호
    • /
    • pp.329-338
    • /
    • 2021
  • 본 연구는 풍력발전의 합리적인 운영 계획과 에너지 저장창치의 용량산정을 위한 풍력 발전량을 예측한다. 예측을 위해 물리적 접근법과 통계적 접근법을 결합하여 풍력 발전량의 예측 방법을 제시하고 풍력 발전의 요인을 분석하여 변수를 선정한다. 선정된 변수들의 과거 데이터를 수집하여 딥러닝을 이용해 풍력 발전량을 예측한다. 사용된 모델은 Bidirectional LSTM(:Long short term memory)과 CNN(:Convolution neural network) 알고리즘을 결합한 하이브리드 모델을 구성하였으며, 예측 성능 비교를 위해 MLP 알고리즘으로 이루어진 모델과 오차를 비교하여, 예측 성능을 평가하고 그 결과를 제시한다.

에너지저장장치 및 STATCOM을 이용한 풍력발전시스템의 출력제어 기법 (Power Output Control of Wind Generation System Through Energy Storage System and STATCOM)

  • 김종율;박준호
    • 전기학회논문지
    • /
    • 제59권10호
    • /
    • pp.1718-1726
    • /
    • 2010
  • Utilization of renewable energy is becoming increaingly important from the viewpoints of environmental protection and conservation of fossil fuel. However, the generating power of renewable energy is always fluctuating due to the environmental status. This paper presents a scheme for supervisory control of wind generation system with the energy storage and STATCOM to reduce the power variation. In this paper, we especially concentrate on constant power output control of wind generation system. In order to achieve this purpose, the coordinated control strategy between different types of energy storage system and reactive power compensation device. The proposed control scheme has been validated by PSCAD/EMTDC simulation. As a result, the proposed scheme can handle the power output of wind generation system with a constant value.

퐁력전원이 피크타임과 발전설비구성에 미치는 영향분석: 제3차 신재생에너지 기술개발 및 이용.보급 기본계획 기준 (Wind Power Generation: Its Impact on Peak Time and Future Power Mix)

  • 이진호;김수덕
    • 한국환경과학회지
    • /
    • 제18권8호
    • /
    • pp.867-876
    • /
    • 2009
  • Although renewable power is regarded a way to active response to climate change, the stability of whole power system could be a serious problem in the future due to its uncertainties such as indispatchableness and intermittency. From this perspective, the peak time impact of stochastic wind power generation is estimated using simulation method up to year 2030 based on the 3rd master plan for the promotion of new and renewable energy on peak time. Result shows that the highest probability of wind power impact on peak time power supply could be up to 4.41% in 2030. The impact of wind power generation on overall power mix is also analyzed up to 2030 using SCM model. The impact seems smaller than expectation, however, the estimated investment cost to make up such lack of power generation in terms of LNG power generation facilities is shown to be a significant burden to existing power companies.

지형에 따른 예상풍력발전단지에 관한 고찰 (Validity of Wind Generation in Consideration of Topographical Characteristics of Korea)

  • 문채주;정권성;정의헌;박귀열
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2008년도 추계학술발표대회 논문집
    • /
    • pp.81-84
    • /
    • 2008
  • This paper discussed the validity of wind force power generation in consideration of the topographical characteristics of Korea. In order to estimate the exact generation of wind power plants, we analyzed and compared wind resources in mountain areas and plain areas by introducing not only wind velocity, the most important variable, but also wind distribution and wind standard deviation that can reflect the influence of landform sufficiently. According to the results of this study, generation was higher at wind power plants installed in southwestern coastal areas where wind velocity was low than at those installed in mountain areas in Gangwondo where wind velocity was high. This suggests that the shape parameter of wind distribution is low due to the characteristics of mountain areas. and the standard deviation of wind velocity is large due to the effect of mountain winds, and therefore, actual generation is low in mountain areas although wind velocity is high.

  • PDF

대관령 풍력단지의 풍력발전량 및 경제성 분석 (A Study on the Wind rower Generation and Its Economic Feasibility at Daekwanryung)

  • 하정우;김수덕
    • 에너지공학
    • /
    • 제14권2호
    • /
    • pp.123-132
    • /
    • 2005
  • 본 논문은 현재 건설 중인 대관령 풍력발전 단지의 풍력 발전 관련 풍속의 분포 및 풍력 발전량을 검토하고, 대관령 풍력 발전의 경제성을 분석하였다. 풍력발전에 있어 풍속의 분포가 핵심요소이고, 풍속분포는 shape factor및 scale factor로 구성되는 Weibull 분포함수로 일반적으로 표현되나, 실제 풍속 분포자료를 조사하여 최적의 계수를 도출, 연간 풍력 발전량을 구하였다. 풍력발전 시설의 초기투자비 및 유지관리 비용은 국내 자료를 이용코자 하였으나, 관련 자료의 확보에 어려움이 있어 유럽풍력협회의 자료(EWEA, 2003. 12)를 적용하였다. 결과는 현재 발전차액제도를 통해 보전되는 풍력에너지의 적정한 기준가격을 마련하는데 유익한 정보를 제공한다.

SMR을 갖는 소형풍력발전시스템의 센서리스 MPPT제어 (Sensorless MPPT Control for a Small-scale Wind Power Generation System with a Switched-mode Rectifier(SMR))

  • 허성덕;이준민;김영석
    • 전기학회논문지
    • /
    • 제62권12호
    • /
    • pp.1688-1693
    • /
    • 2013
  • A small-scale wind power generation system with a switched-mode rectifier(SMR) is proposed. To simplify the converter circuit of the wind power generation system, the synchronous inductors of the permanent magnet synchronous generator(PMSG) replace the inductor for the boost converter. The sensorless maximum power point tracking(MPPT) control is carried out for the wind power generation system with the SMR. The proposed system is verified through the simulations and the experiments.

대규모 풍력발전 계통 연계시 주요 송전망 제약예측시스템 개발에 관한 연구 (A Study on the Development of Critical Transmission Operating Constraint Prediction (CTOCP) System With High Wind Power Penetration)

  • 허진
    • 조명전기설비학회논문지
    • /
    • 제29권1호
    • /
    • pp.86-93
    • /
    • 2015
  • Globally, wind power development is experiencing dramatic growth and wind power penetration levels are increasing. Wind generation is highly variable in time and space and it doesn't guarantee the system reliability and secure system operation. As wind power capacity becomes a significant portion of total generation capacity, the reliability assessment for wind power are therefore needed. At present, this operational reliability assessment is focusing on a generation adequacy perspective and does not consider transmission reliability issues. In this paper, we propose the critical transmission operating constraint prediction(CTOCP) system with high wind power penetration to enhance transmission reliability.

풍력발전시스템이 연계된 계통의 임계 제거시간에 미치는 요인 (Factors Influencing Critical Clearing Time in Network Connected to Wind Generation System)

  • 김세호;김호찬;양익준
    • 조명전기설비학회논문지
    • /
    • 제20권10호
    • /
    • pp.41-46
    • /
    • 2006
  • 상업용으로 계통에 연계되어 운전되는 대부분의 풍력발전기는 유도발전기가 주로 사용되고 있으며 동기발전기와 다른 양상을 보이고 있어 계통에서의 사고발생 후 정상상태로 복귀할 수 있는 최대의 시간(임계 제거시간)을 이용하여 과도상태를 해석하고 있다. 본 연구에서는 풍력 발전시스템이 연계된 계통에 대해 임계 제거시간에 미치는 요인을 분석하였으며 계통해석 프로그램인 Digsilent Power Factory를 이용하였다. 임계 제거시간에 미치는 요인으로는 연계되는 계통의 단락용량(단락전류). 풍력발전 용량, 풍력발전기 역률, 풍력 발전시스템과 연계되는 계통사이의 전용선 길이, 부하 용량이나 역률 등이 있으며 이들의 변화에 대한 임계 제거시간의 영향을 분석하였다.