• Title/Summary/Keyword: wind power farm

Search Result 317, Processing Time 0.033 seconds

Study on the Power Performance on WindPRO Prediction in the Southeast Region of Jeju Island (제주 남동부 지역을 대상으로 한 WindPRO의 발전량 예측에 관한 연구)

  • Hyun, Seunggun;Kim, Keonhoon;Huh, Jongchul
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.184.1-184.1
    • /
    • 2010
  • In order to research the way to evaluate wind resource without actual Met Mast data, this paper has been carried out on the southeastern region of Jeju island, Korea. Although wind turbine has been an economical alternative energy resource, misjudging the prediction of lifetime or payback period occurs because of the inaccurate assessment of wind resource and the location of wind turbine. Using WindPRO(Ver. 2.7), a software for wind farm design developed by EMD from Denmark, wind resources for the southeastern region of Jeju island was analyzed, and the performance of WindPRO prediction was evaluated in detail. Met Mast data in Su-san 5.5Km far from Samdal wind farm, AWS in Sung-san 4.5km far from Samdal wind farm, and Korea Wind Map data had been collected for this work.

  • PDF

Evaluation of Implementation Potential of Offshore Wind Farm Capacity in Korea Using National Wind Map and Commercial Wind Farm Design Tool (국가바람지도와 상용 단지설계 프로그램을 활용한 국내 해상풍력단지 공급가능 잠재량 산정)

  • Song, Yuan;Kim, Chanjong;Paek, Insu;Kim, Hyungoo
    • Journal of the Korean Solar Energy Society
    • /
    • v.36 no.4
    • /
    • pp.21-29
    • /
    • 2016
  • Commercial wind farm design tools and the national wind map are used to determine the implementation potential of offshore wind power in Korea in this study. For this, the territorial waters of Korea were divided into nine analysis regions and a commercial CFD code was used to obtain wind resource maps at 100m A.S.L. which is the hub height of a 5MW wind turbine used in this study. With the wind resource obtained, factors including water depth, distance from substations, minimum and maximum capacity of a wind farm, distance between turbines and wind farms were considered to determine wind power potential. Also, the conservation areas, military zones, ports, fishing grounds, etc. were considered and excluded. As the result, a total capacity of 6,720 MW was found to be the implementation potential and this corresponds to $3.38MW/km^2$ in API. Also if the distance from the substation is not considered, the potential increased to be 10,040 MW. This offshore wind farm potential is considered enough to satisfy the target of wind farm capacities in the 7th national plan for electricity demand and supply.

Analysis of the response of a distance relay for wind farm intertie protection (풍력발전단지 연계선 보호 거리계전기의 응동 특성 분석)

  • Kang, Yong-Cheol;Lee, Hye-Won;Zheng, Tai-Ying;Kang, Hae-Gweon
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.484_485
    • /
    • 2009
  • Power output of a wind farm fluctuates throughout a day. This affect a distance relay for wind farm intertie protection because a voltage of a relaying point varies due to fluctuating output of a wind farm. This paper describes the analysis of the response of a distance relay for intertie protection when the power output of a wind farm increases. A series of single phase to ground faults were also simulated and analyzed with PSCAD/EMTDC generated data.

  • PDF

Study on Wind Power Prediction model based on Spatial Modeling (공간모델링 기반의 풍력발전출력 예측 모델에 관한 연구)

  • Jung, Solyoung;Hur, Jin;Choy, Young-do
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.1 no.1
    • /
    • pp.163-168
    • /
    • 2015
  • In order to integrate high wind generation resources into power grid, it is an essential to predict power outputs of wind generating resources. As wind farm outputs depend on natural wind resources that vary over space and time, spatial modeling based on geographic information such as latitude and longitude is needed to estimate power outputs of wind generation resources. In this paper, we introduce the basic concept of spatial modeling and present the spatial prediction model based on Kriging techniques. The empirical data, wind farm power output in Texas, is considered to verify the proposed prediction model.

A Study on the Building of Tuna Farming in Floating Offshore Wind Power Generation Field at East Sea (동해 부유식 해상풍력발전단지 내 참다랑어 양식장 조성에 관한 연구)

  • Choi, Gun Hwan;Kim, Mi Jeong;Jang, Ki Ho;Kim, Hyo Seon
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.33 no.5
    • /
    • pp.179-186
    • /
    • 2021
  • We need measures that can come up with alternative about fishery living zone and enhance local acceptance for responding to the increase in the proportion of renewable energy production and construction of 12GW Offshore wind power according to Korea's Renewable Energy 3020 initiative and Korean-version New Deal. In this study, We suggest that differentiation plans of co-location model in connection with offshore wind power generation suitable for the East Sea. The East Sea is an optimal site for building of a floating offshore wind power generation(FOWPG) field. It is expected that economic effects like energy production, aquatic resource development and tourism industrialization by farming bluefin tuna which is high valued fish and suitable for offshore aquaculture on public waters in FOWPG field. And we can confirm that budget reduction, smart management by sharing operation management technology and increase in fishermen income.

Economic analysis of jeju offshore pilot run wind farm by sensitivity analysis (민감도 분석을 적용한 제주 연안 풍력단지 설계의 경제성 분석)

  • Lee, K.H.;Park, J.H.;Jin, J.W.;Kwon, K.R.;Choi, K.H.
    • Journal of Power System Engineering
    • /
    • v.16 no.5
    • /
    • pp.13-19
    • /
    • 2012
  • In this paper, the offshore wind farms have been designed by using WindPRO with the help of real wind data measurements at Jeju Costal area by calculating the annual energy production for exact economic evaluation. In order to achieve benefit of wind farm, the annual revenue for power generation have been calculated with SMP and REC value. And construction cost has derived from the real wind farm project case. Also O&M cost has been estimated by OMCE (Operating & Maintenance Cost Estimator) to get accurate cost of wind farm. Economic evaluation of wind farms have been performed by comparing above parameters. In addition, sensitivity analysis calculating the effect of these factors has also been carried out.

A Design for a Fuzzy Logic based Frequency Controller for Efficient wind Farm Operation (풍력발전단지의 효율적 운영을 위한 퍼지로직 기반 주파수 제어기 설계)

  • Kim, Se Yoon;Kim, Sung Ho
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.20 no.2
    • /
    • pp.186-192
    • /
    • 2014
  • Recently wind energy penetration into power systems has increased. Wind power, as a renewable energy source, plays a different role in the power system compared to conventional power generation units. As long as only single and small wind power units are installed in the power system, wind power does not influence power system operation and can easily be integrated. However, when wind power penetration reaches a significantly high level and conventional power production units are substituted, the impact of wind power on the power system becomes noticeable and must be handled. The connection of large wind turbines and wind farms to the grid has a large impact on grid stability. The electrical power system becomes more vulnerable to and dependent on wind energy production, and therefore there is an increased concern about the large wind turbines impact on grid stability. In this work, a new type of fuzzy logic controller for the frequency control of wind farms is proposed and its performance is verified using SimWindFarm toolbox which was developed as part of the Aeolus FP7 project.

Determination of the Hybrid Energy Storage Capacity for Wind Farm Output Compensation (풍력발전단지 출력보상용 하이브리드 에너지저장장치의 용량산정)

  • Kim, Seong Hyun;Jin, Kyung-Min;Oh, Sung-Bo;Kim, Eel-Hwan
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.4
    • /
    • pp.23-30
    • /
    • 2013
  • This paper presents the determination method of the hybrid energy storage capacity for compensating the output of wind power when disconnecting from the grid. In the wind power output compensation, a lot of charging and discharging time with lithium-ion battery will be deteriorated the life time. And also, this fluctuation will cause some problems of the power quality and power system stability. To solve these kind of problems, many researchers in the world have been studied with BESS(Battery Energy Storage System) in the wind farm. But, BESS has the limitation of its output during very short term period, this means that it is difficult to compensate the very short term output of wind farm. Using the EDLC (Electric Double Layer Capacitor), it is possible to solve the problem. Installing the battery system in the wind farm, it will be possible to decrease the total capacity of BESS consisting of HESS (Hybrid Energy Storage System). This paper shows simulation results when not only BESS is connected to wind farm but also to HESS. To verify the proposed system, results of computer simulation using PSCAD/EMTDC program with actual output data of wind farms of Jeju Island will be presented.

Analysis on Siting Strategy for Offshore Wind Farm Based on National Wind Map and GIS (국가바람지도 및 지리정보시스템 기반의 해상풍력단지 입지전략 연구)

  • Kim, Hyun-Goo;Song, Kyu-Bong;Hwang, Sun-Young;Yun, Jin-Ho;Hwang, Hyo-Jeong
    • Journal of Environmental Science International
    • /
    • v.18 no.8
    • /
    • pp.877-883
    • /
    • 2009
  • This study has analyzed the scale, location, resource potential and feasibility of offshore wind farm scientifically and systematically based on the national wind map and GIS. For long-term wind power development, this study pursues siting strategy building, selection of target area and deciding development priority as well as the presenting a basis for assessment that are necessary for policy decision making by making theme layers under GIS environment. According to the analysis after organizing technological development by stages, even if only the most suitable sites are developed among the area of offshore wind farm candidates that can be developed under the current technological standard, it has been evaluated as being able to develop about 3 times of the wind power dissemination target until 2012. It is expected that about 5% of territorial water area can be developed in a short-term future while the southern offshore area possessing relatively favorable wind resource than the western offshore has been identified as the most feasible site. While about 23% of territorial water area has been classified as potential area for offshore wind farm development in a long-term future, even Jeju Island and offshore of Ulsan possessing excellent wind resource have been analyzed as feasible sites. The feasibility assessment of offshore wind lam development established by this study is expected to assist national strategy building for accomplishing the wind power dissemination target.

Comparative evaluation of different offshore wind turbine installation vessels for Korean west-south wind farm

  • Ahn, Dang;Shin, Sung-chul;Kim, Soo-young;Kharoufi, Hicham;Kim, Hyun-cheol
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.9 no.1
    • /
    • pp.45-54
    • /
    • 2017
  • The purpose of this study is to evaluate various means of wind power turbines installation in the Korean west-south wind farm (Test bed 100 MW, Demonstrate site 400 MW). We presented the marine environment of the southwest offshore wind farm in order to decide the appropriate installation vessel to be used in this site. The various vessels would be WTIV (Wind turbine installation vessel), jack-up barge, or floating crane ${\cdots}$ etc. We analyzed the installation cost of offshore wind turbine and the transportation duration for each vessel. The analysis results showed the most suitable installation means for offshore wind turbine in the Korean west-south wind farm.