• Title/Summary/Keyword: wind power farm

Search Result 317, Processing Time 0.025 seconds

Prediction and Validation of Annual Energy Production of Garyeok-do Wind Farm in Saemangeum Area (새만금 가력도 풍력발전단지에 대한 연간발전량 예측 및 검증)

  • Kim, Hyungwon;Song, Yuan;Paek, Insu
    • Journal of Wind Energy
    • /
    • v.9 no.4
    • /
    • pp.32-39
    • /
    • 2018
  • In this study, the annual power production of a wind farm according to obstacles and wind data was predicted for the Garyeok-do wind farm in the Saemangeum area. The Saemangeum Garyeok-do wind farm was built in December 2014 by the Korea Rural Community Corporation. Currently, two 1.5 MW wind turbines manufactured by Hyundai Heavy Industries are installed and operated. Automatic weather station data from 2015 to 2017 was used as wind data to predict the annual power production of the wind farm for three consecutive years. For prediction, a commercial computational fluid dynamics tool known to be suitable for wind energy prediction in complex terrain was used. Predictions were made for three cases with or without considering obstacles and wind direction errors. The study found that by considering both obstacles and wind direction errors, prediction errors could be substantially reduced. The prediction errors were within 2.5 % or less for all three years.

Frequency Stabilization Method for Grid Integration of Large-scale Centralized Wind Farms via VSC-HVDC Technology

  • Peng, Yanjian;Li, Yong;Liu, Fang;Xu, Zhiwei;Cao, Yijia
    • Journal of Power Electronics
    • /
    • v.18 no.2
    • /
    • pp.547-557
    • /
    • 2018
  • This work proposes a control method of frequency stabilization for grid integration of large-scale wind farms via the voltage source converter-based high-voltage direct current (VSC-HVDC) technology. First, the topology of grid integration of a large-scale wind farm via the VSC-HVDC link is provided, and simple control strategies for wind turbines, wind farm side VSC (WFVSC), and grid side VSC are presented. Second, a mathematical model between the phase angle of WFVSC and the frequency of the wind farm is established. The control principle of the large-scale wind power integrated system is analyzed in theory in accordance with the mathematical model. Third, frequency and AC voltage controllers of WFVSC are designed based on the mathematical model of the relationships between the phase angle of WFVSC and the frequency of the wind farm, and between the modulation index of WFVSC and the voltage of the wind farm. Corresponding controller structures are established by deriving a transfer function, and an optimization method for selecting the parameters of the frequency controller is presented. Finally, a case study is performed under different operating conditions by using the DIgSILENT/PowerFactory software. Results show that the proposed control method has good performance in the frequency stabilization of the large-scale wind power integrated system via the VSC-HVDC technology.

Study on the Available Power of a Wind Turbine for Wind Farm Control (풍력단지 제어를 위한 생산가능 출력에 대한 연구)

  • Oh, Yong Oon;Paek, In Su;Nam, Yoon Su;La, Yo Han
    • Journal of the Korean Solar Energy Society
    • /
    • v.34 no.1
    • /
    • pp.1-7
    • /
    • 2014
  • A study on the available power of a wind turbine to be used for wind farm control was performed in this study, To accurately estimate the available power it is important to obtain a suitable wind which represents the three dimensional wind that the wind turbine rotor faces and also used to calculate the power. For this, two different models, the equivalent wind and the wind speed estimator were constructed and used for dynamic simulation using matlab simulink. From the comparison of the simulation result with that from a commercial code based on multi-body dynamics, it was found that using the hub height wind to estimate available power from a turbine results in high frequency components in the power prediction which is, in reality, filtered out by the rotor inertia. It was also found that the wind speed estimator yielded less error than the equivalent wind when compared with the result from the commercial code.

Analysis of Wind Environments for Siting a Wind Farm (풍력발전 단지조성을 위한 바람환경 분석)

  • 김현구;최재우;손정봉;정우식;이화운
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.19 no.6
    • /
    • pp.745-756
    • /
    • 2003
  • An analysis of wind environments using computational fluid dynamics and an evaluation of wind resources using measurement data obtained from meteorological observation sites at Homi-Cape, Pohang have been carrid out for siting a wind farm. It was shown that a numerical simulation using computational fluid dynamics would provide reliable wind resource map in complex terrain with land-sea breeze condition. As a result of this investigation, Homi-Cape wind farm with 11.25 ㎿ capacity has been designed for maximum power generation and 25.7 GWh electricity production is predicted.

Mitigation of Load Frequency Fluctuation Using a Centralized Pitch Angle Control of Wind Turbines

  • Junqiao, Liu;Rosyadi, Marwan;Takahashi, Rion;Tamura, Junji;Fukushima, Tomoyuki;Sakahara, Atsushi;Shinya, Koji;Yosioka, Kazuki
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.2 no.1
    • /
    • pp.104-110
    • /
    • 2013
  • In this paper an application of centralized pitch angle controller for fixed speed wind turbines based wind farm to mitigate load frequency fluctuation is presented. Reference signal for the pitch angle of each wind turbine is calculated by using proposed centralized control system based on wind speed information. The wind farm in the model system is connected to a multi machine power system which is composed of 4 synchronous generators and a load. Simulation analyses have been carried out to investigate the performance of the controller using real wind speed data. It is concluded that the load frequency of the system can be controlled smoothly.

ARIMA Based Wind Speed Modeling for Wind Farm Reliability Analysis and Cost Estimation

  • Rajeevan, A.K.;Shouri, P.V;Nair, Usha
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.4
    • /
    • pp.869-877
    • /
    • 2016
  • Necessity has compelled man to improve upon the art of tapping wind energy for power generation; an apt reliever of strain exerted on the non-renewable fossil fuel. The power generation in a Wind Farm (WF) depends on site and wind velocity which varies with time and season which in turn determine wind power modeling. It implies, the development of an accurate wind speed model to predict wind power fluctuations at a particular site is significant. In this paper, Box-Jenkins ARIMA (Auto Regressive Integrated Moving Average) time series model for wind speed is developed for a 99MW wind farm in the southern region of India. Because of the uncertainty in wind power developed, the economic viability and reliability of power generation is significant. Life Cycle Costing (LCC) method is used to determine the economic viability of WF generated power. Reliability models of WF are developed with the help of load curve of the utility grid and Capacity Outage Probability Table (COPT). ARIMA wind speed model is used for developing COPT. The values of annual reliability indices and variations of risk index of the WF with system peak load are calculated. Such reliability models of large WF can be used in generation system planning.

Smooth Wind Power Fluctuation Based on Battery Energy Storage System for Wind Farm

  • Wei, Zhang;Moon, Byung Young;Joo, Young Hoon
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.2134-2141
    • /
    • 2014
  • This paper addresses on a wind power system with BESS(Battery Energy Storage System). The concerned system consists of four parts: the wind speed production model, the wind turbine model, configure capacity of the battery energy storage, battery model and control of the BESS. First of all, we produce wind speed by 4-component composite wind speed model. Secondly, the maximum available wind power is determined by analyzing the produced wind speed and the characteristic curve of wind power. Thirdly, we configure capacity of the BESS according to wind speed and characteristic curve of wind speed-power. Then, we propose a control strategy to track the power reference. Finally, some simulations have been demonstrated to visualize the feasibility of the proposed methodology.

Investigation on Selecting Optimal Wind Turbines in the Capacity Factor Point of View (이용률 관점에서의 최적 풍력발전기 선정에 대한 연구)

  • Woo, Jae-Kyoon;Kim, Byeong-Min;Paek, In-Su;Yoo, Neung-Soo;Nam, Yoon-Su
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.5
    • /
    • pp.60-66
    • /
    • 2011
  • Selecting optimal wind turbine generators for wind farm sites in the capacity factor point of view is performed in this study. A program to determine the best wind turbine generator for the maximum capacity factor for a site was developed. The program uses both the wind characteristics of the site of interest and the power curves of the wind turbines. The program developed was applied to find out optimal wind turbine generators of three different sites in complex terrain and successfully yielded the best site dependent wind turbine generators. It was also used to determine the best wind turbine generator of the wind farm currently operating in Korea and proved its usefulness. The program and methodology developed in this study considered to be very useful at the initial design stage of the wind farm to determine the best wind turbine generators for the site of interest.

Power Quality Analysis of Jeju Power System during HVDC Overhaul using PSCAD/EMTDC (PSCAD/EMTDC에 의한 직류연계선 오버홀시 제주계통의 전력품질 분석)

  • Kang, Bo-Seung;Kim, Jae-Hong;Kim, Eel-Hwan;Kim, Se-Ho;Oh, Seong-Bo;Song, Ki-Heouk
    • Proceedings of the KIPE Conference
    • /
    • 2008.06a
    • /
    • pp.82-84
    • /
    • 2008
  • This paper presents the modeling and power quality analysis of Jeju island power system connected with wind farm, and thermal power plant. It is for indicating the influence of wind farm operation in steady and transient state in Jeju island power system during the HVDC system overhaul period. For the computer simulation, three kinds of main item are modeled, which are 67[MW] wind farm, thermal power plant and Jeju power load. To analyze the influence of the wind power generation to the Jeju power system, two kinds of simulations are carried out by using the PSCAD/EMTDC program. One is the steady state operation under the variable speed wind, and the other is the transient state operation when all of wind farms in Jeju island are disconnected from the Jeju power grid instantaneously on the rated power output. With the comparison of these results, it is useful for analyzing the power quality of Jeju power system versus wind power generation.

  • PDF

Design and Implementation of EMS for Real-Time Power Generation Control of Wind Farm Based on Wake Effect Optimization (후류 영향 최적화 기반 실시간 풍력발전단지 발전 제어용 EMS의 설계 및 구현)

  • Kim, Joon-Hyoung;Sung, Ki-Won;Jung, Sung-Hwan
    • Journal of Korea Multimedia Society
    • /
    • v.25 no.8
    • /
    • pp.1097-1108
    • /
    • 2022
  • This paper aimed to design and implement an EMS for real-time power generation control based on wake effect optimization of wind farm, and then to test it in commercial operating wind farm. For real-time control, we proposed the wake band-based optimization and setting the wake effect distance limit, and when the wake effect distance limit was set to 7D in the actual wind farm layout, the calculation time was improved by about 93.94%. In addition, we designed and implemented the script-based EMS for flexible operation logic management in preparation for unexpected issues during testing, and it was installed and tested on a wind farm in commercial operation. However, three issues arose during the testing process. These are the communication interface problem of meteorological tower, the problem of an abnormal wake effect, and the problem of wind turbine yaw control. These issues were solved by modifying the operation logic using EMS's script editor, and the test was successfully completed in the wind farm in commercial operation.