• Title/Summary/Keyword: whole building

Search Result 773, Processing Time 0.024 seconds

Structural Design of Cheongna City Tower

  • Chung, Kwangryang;Kim, Jung-Hyun;Song, Younghoon;Kim, Sihyeong;Kang, Jihun
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.3
    • /
    • pp.193-201
    • /
    • 2021
  • Cheongna City Tower is a 448-meter-high rise observatory tower with 8.7:1 aspect ratio located at central lake park in Incheon Cheongna international city. The tower is a crystal shaped image and it turns invisible when the façade is activated. The tower was planned to be hexagonal 30-story building with two basements which are composed of mega frame structure using mega column and mega brace. In order to minimize the wind effect, the blow-through area was installed so that the wind can pass through. This observatory tower is an unprecedented project since the whole building is covered by façade for invisibility effect.

Exploring a BIM-based approach of project management

  • MA, Xiaozhi;XIONG, Feng;DONG, Na
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.241-244
    • /
    • 2015
  • Within the building industry, building information modelling has been widely applied among different organizations, disciplines and project phases. In order to achieve coordination and synergy collaborative effort, it demands organized information flow and communication for effective implementation of project management through the construction process. Although many BIM researches provides solutions for project management, few efforts have involved the whole life-cycle process of project. In this article, BIM-based project management relying on a series of applications of BIM technology was introduced by coupling management requirement of a project with BIM. Through adopting BIM to the life-cycle management of the project and incorporating BIM applications to project management practice, we have developed a BIM-based project management approach that specialize in integrated BIM chain and interface-supporting system. At the end, the developing process of BIM-based project management approach is concluded.

  • PDF

The Whole Body Counting Experience on the Internal Contamination of $^{131}I$ at Korean Nuclear Power Plants (전신계측기를 이용한 원전종사자의 $^{131}I$ 내부방사능 측정 경험 및 개선방향에 대한 연구)

  • Kim, Hee-Geun;Kong, Tae-Young
    • Journal of Radiation Protection and Research
    • /
    • v.34 no.3
    • /
    • pp.121-128
    • /
    • 2009
  • During the maintenance period at Korean nuclear power plants, internal exposure of radiation workers occurred by the inhalation of $^{131}I$ released to the reactor building when primary system was opened. The internal radioactivity of radiation workers contaminated by $^{131}I$ was immediately measured using a whole body counter and the whole body counting was performed again after a few days. In this study, the intake estimated from the record history of entrance to radiation control areas and the measurement results of air sampling for $^{131}I$ in those areas, were compared with that from the results of whole body counting. As a result, it was concluded that the intake estimation using whole body counting and air sampling showed similar results.

A Study on the Structural System of Space Configuration in Architectural Plane - Focusing on the Coalesce scheme development for part-whole Process - (건축 평면에서 공간 형상의 구조 체계에 관한 연구 - 부분이 전체를 이루는 합체 도식 개발을 중심으로 -)

  • Piao, Shun-Mei;Yoon, Chae-Shin
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.9
    • /
    • pp.9-20
    • /
    • 2018
  • There are many large and small spaces in the interior of the building, and these spaces are arranged and connected to form a systematic spatial structure. A structure is a collection of several parts to form a whole. In other words, the spatial structure in architecture can be seen as a whole organized and organized as individual unit spaces are gathered together. Therefore, in order to understand the spatial structure, we first need to define the unit spaces that form part, how they are interconnected and arranged, and then understand how and how these unit spaces are organized to form a whole. The main purpose of this study is to study the structural system of space based on the shape information of space on architectural plane. This means interpreting the process and method of how the unit spaces defined as a certain shape on the architectural plane are organized step by step, integrated into a higher level, and eventually integrated into one whole. In this paper, the shape and layout of the unit space are identified in the architectural plan, the connection relation is defined, and expressed in the network form. And suggests a new methodology for interpreting the organizational process in which the following spaces are integrated as a whole. This new methodology is based on human perceptual characteristics. When people recognize an object, they recognize the object partly and completely. We want to explain the relationship between parts of space and the whole according to their characteristics.

A Comparative Study on Unit Space Segmentation Method of Spatial Analysis Theories in Architectural Plan - Focusing on the space name, sector, enclosing balance, convex space - (건축 평면에서 공간 분석 이론의 단위 공간 분절 방식에 대한 비교 연구 - 실별 명칭, 섹터, 포위 평형, 볼록 공간 분절을 중심으로 -)

  • Piao, Shun-Mei;Kim, Ma-Rie;Yoon, Chae-Shin
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.3
    • /
    • pp.11-21
    • /
    • 2018
  • This paper explores the structure of space in architecture from a viewpoint that individual unitized spaces are gathered to form the whole. To understand the spatial structure of architecture, firstly we need to understand each unitized spaces, and secondly, one must understand how the following adjacent spaces are connected to form the whole building. this gives salience to a fact that understanding the whole comprehensively. It is the most fundamental bases that must be understood and unitized when understanding the spatial structure of an existing building and designing a new one. It is necessary to hypostatize space as an abstract notion. In regards to this space examines the logical flow of structure within actual space. Hypostasieren process includes the process of shaping space and the shape information. In this process we need to refer to the properties of space and the morphological characteristics of physical elements. The segment of the unitized space is the realization process of the basic space. This study aims to provide a theoretical basis for analysis and design of spatial structure by comparing several representative methods of segmenting unitized space.

Case Study on the Improvement of Underground Building Works through the VE (VE 적용에 의한 지하 골조공사 개선연구)

  • Hong Jae-Wook;Kim Sun-Kuk;Lee Jong-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.106-113
    • /
    • 2004
  • Most construction project managers should focus on the reasonable cost-down with same quality and function-enhancement with same cost for the value-added construction project delivery in construction industry. Especially, a building structure construction is one of the most important processes to affect the total cost and schedule in building construction project. It means that the process has the possibility of project cost-down or quality-enhancement among the whole project life-cycle. This research focuses on the importance of underground structure of building project by increasing underground use ratio in the urban building construction projects nowadays. This research adopts VE method for the improvement of cost and time by process and analysis dimension modeling on the underground building structure construction, and verifies it throughout the case study, This research is the basic study on the improvement of underground building works through the value engineering method in construction industry.

A Semi-Automatic Building Modeling System Using a Single Satellite Image (단일 위성 영상 기반의 반자동 건물 모델링 시스템)

  • Oh, Seon-Ho;Jang, Kyung-Ho;Jung, Soon-Ki
    • The KIPS Transactions:PartB
    • /
    • v.16B no.6
    • /
    • pp.451-462
    • /
    • 2009
  • The spread of satellite image increases various services using it. Especially, 3D visualization services of the whole earth such as $Google\;Earth^{TM}$ and $Virtual\;Earth^{TM}$ or 3D GIS services for several cities provide realistic geometry information of buildings and terrain of wide areas. These service can be used in the various fields such as urban planning, improvement of roads, entertainment, military simulation and emergency response. The research about extracting the building and terrain information effectively from the high-resolution satellite image is required. In this paper, presents a system for effective extraction of the building model from a single high-resolution satellite image, after examine requirements for building model extraction. The proposed system utilizes geometric features of satellite image and the geometric relationship among the building, the shadow of the building, the positions of the sun and the satellite to minimize user interaction. Finally, after extracting the 3D building, the fact that effective extraction of the model from single high-resolution satellite will be show.

A Study on the Lime of Government Constructions Based on the Analysis of Construction Reports in the Late of Joseon Dynasty(17~19c) - Emphasized on the production, provision, and application of lime - (산릉(山陵).영건의궤(營建儀軌) 분석을 통한 조선후기 관영 건축공사의 석회에 관한 연구 - 석회의 생산.조달.적용을 중심으로 -)

  • Lee, Kweon-Yeong
    • Journal of architectural history
    • /
    • v.18 no.6
    • /
    • pp.23-46
    • /
    • 2009
  • The history to have used lime in building construction was much long without distinction of the East or the West. The ancient nations of korean peninsula had used lime as construction material. The witness was discovered in the kings' tombs of fifth century. In the Joseon dynasty(15~19c), what applied several developed lime compounds to the kings' tombs have been recorded in 'Sanleong-Uigwe(山陵儀軌)' & 'Yeonggeon-Uigwe(營建儀軌)' of those days documents. Therefore, this paper is to examine the whole procedures from the product and provision of lime to its application through those days documents. Following conclusions have been reached through the study. Three lime compounds to be developed for the kings' tombs was extendedly applied to residential government buildings step by step within the current of time. These compounds to be used in the kings' tombs of the Joseon dynasty had been correlated to those of the ancient nations, which were nations of korean peninsula in narrow range, chinese and orient nations in broad range. These compounds have possibilities of development as the environmental-friendly building material. And these compounds should provide a standard specification for conservation & restoration of the traditional and cultural properties. I could confirm that the whole procedures had not been developed within limited space-time of the specified nation & period, but within interactions of the nations & periods. In the periods which disturb its interaction, the expansion of productivity in building construction was interfered.

  • PDF

The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project (근로시간 단축에 따른 터널 공사의 표준 공기 및 공사비 영향 분석)

  • Park, Taeil;Kim, Kyunghoon;Shin, Eun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.37-43
    • /
    • 2019
  • After the new standards for labor hours has been released, various problems come up in construction field, such as income reduction of employees, extension of construction period and increased construction cost. Although it is expected that the impact of the new standard on the construction industry is more worse than other industries form the view of productivity, not much works have been done to identify those impacts. Thus, this research proposes the standard construction processes, excavation cycle, and unit construction period for NATM tunnel project based on 'Construction Standard Production Rates.'The study also investigated the impact of reduced labor hours on the management of work crews, construction periods and costs of tunnel projects. The results showed that under the 52 labor hour standard, the construction periods for the excavation work and whole project was increased by 20% and 8.9%, respectively, but the construction costs for the excavation work and whole project was decreased by 1.4% and 0.6%, respectively.

Analysis on Green BIM based Atrium Sizes in the Early Design Stage

  • Jeong, Seung-Woo;Lee, Kweon-Hyoyng;Choo, Seung-Yeon
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.260-266
    • /
    • 2013
  • This study for establishing specific standards of atrium design aims to discuss design of atrium to consider energy performance according to the types of atrium of office building. In order to evaluate a type and a scale of atrium at the early design stage, modeling details of mass design were set as standards of conceptual design. In the experiment, Project Vasari was used to analyze modeling and energy consumption, based on the LOD 100-step suggested by AIA, because there is no guideline to specify a level of modeling details at each design process. From this analysis, the correlation among a simple-typed atrium and scale and energy load was understood, and the followings are the considerations for designing an atrium. First, the single-sided atrium reduced energy the most, and it was followed by three-sided, two-sided, four-sided and continuous-typed ones. On the whole, they could decrease energy by up to about 15%. Also, the atrium with a wide facade facing in the south was more favorable to reduce energy. Second, planning an atria within 10~30% of the whole building area was more energy efficient. Third, rather than the depth, adjusting the length in designing an atrium could reduce cooling and heating loads by 1.5% per 1m. As explained above, energy performance evaluation considering types and planning elements of atrium helps to assess alternatives in a reasonable way. In particular, considering the use of building needs to be preceded to select a type of atrium, although it is also important to consider its planning elements.

  • PDF