• Title/Summary/Keyword: wheel off-loading set-point

Search Result 3, Processing Time 0.02 seconds

Ground Software Validation Test for Wheel Off-loading of COMS (통신해양기상위성의 휠오프로딩 지상국 소프트웨어 검증시험)

  • Park, Young-Woong;Yang, Koon-Ho
    • Aerospace Engineering and Technology
    • /
    • v.9 no.2
    • /
    • pp.51-56
    • /
    • 2010
  • There are two main software in COMS ground station at the normal mode operation - stationkeeping and wheel off-loading. In this paper, ground software validation test for wheel off-loading is summarized and described. The wheel off-loading was performed the design change from E3000 heritage and analyzed. The wheel off-loading of ground software has two part; one is wheel off-loading management for parameters change at the thruster set switching time and the other is wheel off-loading set-point being sent to satellite for the reference momentum.

Study on the wheel allocation and the wheel momentum off-loading for COMS having asymmetric solar array configuration (비대칭 태양전지판 형상의 천리안위성 휠배치와 휠모멘텀조정에 관한 연구)

  • Park, Young-Woong;Choi, Hong-Taek
    • Aerospace Engineering and Technology
    • /
    • v.12 no.2
    • /
    • pp.57-63
    • /
    • 2013
  • The mission of a lot of satellites on geostationary orbit is the communication and/or the broadcasting. These satellites need a big power, so these have a large solar array. Recently, the new satellite for Earth environment monitoring is developing on geostationary orbit. The payload of Earth monitoring satellite requires better thermal condition on detector. Therefore this satellite uses a boom for the attitude stability instead of rejecting one-side solar array as a heat source. The other hand, it uses some momentum wheels being a more momentum capacity to control the large disturbance by solar pressure due to the asymmetric solar array configuration. In this paper, the analysis on the wheel allocation and the wheel off-loading for COMS is summarized and the results are verified by telemetry of COMS. COMS has no boom and a perfectly asymmetric solar array configuration, and it is operating well on geostationary orbit.

Operational Validation of the COMS Satellite Ground Control System during the First Three Months of In-Orbit Test Operations (발사 후 3개월간의 궤도 내 시험을 통한 통신해양기상위성 관제시스템의 운용검증)

  • Lee, Byoung-Sun;Kim, In-Jun;Lee, Soo-Jeon;Hwang, Yoo-La;Jung, Won-Chan;Kim, Jae-Hoon;Kim, Hae-Yeon;Lee, Hoon-Hee;Lee, Sang-Cherl;Cho, Young-Min;Kim, Bang-Yeop
    • Journal of Satellite, Information and Communications
    • /
    • v.6 no.1
    • /
    • pp.37-44
    • /
    • 2011
  • COMS(Chollian) satellite which was launched on June 26, 2010 has three payloads for Ka-band communications, geostationary ocean color imaging and meteorological imaging. In order to make efficient use of the geostationary satellite, a concept of mission operations has been considered from the beginning of the satellite ground control system development. COMS satellite mission operations are classified by daily, weekly, monthly, and seasonal operations. Daily satellite operations include mission planning, command planning and transmission, telemetry processing and analysis, ranging and orbit determination, ephemeris and event prediction, and wheel off-loading set point parameter calculation. As a weekly operation, North-South station keeping maneuver and East-West station keeping maneuver should be performed on Tuesday and Thursday, respectively. Spacecraft oscillator updating parameter should be calculated and uploaded once a month. Eclipse operations should be performed during a vernal equinox and autumnal equinox season. In this paper, operational validations of the major functions in COMS SGCS are presented for the first three month of in-orbit test operations. All of the major functions have been successfully verified and the COMS SGCS will be used for the mission operations of the COMS satellite for 7 years of mission life time and even more.